1581371668576.png
 
Active site. Foundation prep work continues. Most workers were heading out by 4 pm.

IMG_3636.jpg


Plenty of de-watering equipment on site.
IMG_3603.jpg


IMG_3599.jpg


IMG_3600.jpg


This is an interesting piece of heavy equipment being employed by Keller Geotechnical. More below;
IMG_3598.jpg


Looks perhaps like they are assembling re-bar cages for the piles.
IMG_3626.jpg


IMG_3608.jpg


Keller Geotechnical is involved in setting piles/columns using vibro-compaction and dynamic deep compaction. The yellow tower is their special grout mixer used to create a more stable soil-cement matrix. It would appear that the soil here is particularly weak and requires intervention in order to allow for the heavy foundation. Not sure at which depth bedrock/strata is encountered at this site.
IMG_3616.jpg


More on Keller here: https://www.keller.com/what-we-do/ground-improvement.aspx
 

Attachments

  • IMG_3603.jpg
    IMG_3603.jpg
    323.1 KB · Views: 341
Last edited:
This site is huge!
As shown in Edward's photo's, the first of many cranes:
IMG_4972.jpg


IMG_4987.jpg


IMG_4973.jpg


View of the Keller deep casings and pad for Crane 1:
IMG_4989.jpg


Rebar cage, some forms, and multiple shiny new concrete buckets all ready to go:
IMG_4974.jpg


IMG_4977.jpg


North wall, access stairs, and some of the first columns:
IMG_4979.jpg


View looking southward from northwest end of pit:
IMG_4988.jpg


IMG_4984.jpg


Looking southeastward from northwest side of excavation:
IMG_4986.jpg


Pinning along south rim of pit:
IMG_4980.jpg


IMG_4991.jpg
 

Back