April 19
The south tower should be going up shortly as the base and footing in place for it. The north tower could be ready for the crane by late May
49800403816_38f60fe1ba_b.jpg

49800713052_40a251dae8_b.jpg

49800712867_f5db3820f9_b.jpg

49800712652_342c763c0c_b.jpg

49799855538_85d3d62274_b.jpg

49799853693_0378629eee_b.jpg

49800708282_2c02987ee9_b.jpg

49799853103_7bc389e055_b.jpg
 


Tippett Park

Project Timeline

  • Fall 2020: Conceptual design and community engagement
  • Summer 2021: Construction drawing preparation
  • Fall 2022: Tender for construction
  • Spring 2023: Construction
The timeline is subject to change.

A new 2580 m² park is being designed at 21 Monte Kwinter Crt., located south of Wilson Avenue and west of Tippett Road. The project is a joint park dedication in partnership with 30 Tippett residential and 4-6 Tippett mixed-use developments.

The proposed park is in the conceptual design phase and includes the following elements:

  • A central pedestrian pathway leading to:
    • Public transportation
    • Seating and/or picnic elements
    • New plantings/planting beds
    • A large children’s playground
    • Small sculptural water play features
    • An outdoor fitness area
    • An open lawn area
The new Tippett Park will be part of a larger network of public spaces in the surrounding area currently under development which includes a small dog relief area with fence separation and a boardwalk and perennial gardens bordering the park to the south.

The City, in partnership with the developer, is leading the park development and construction.


tipp.jpg
tipp2.png
tipp3.jpg

 