Progress from today at the crossing beside Vi's for Pies. Track is in and lots of hoarding is either up or is being setup. Pretty sure asphalt/road is in and they're just doing median/track concrete work now.
I remember reading in one of the transforming Edmonton posts that casting rail in the bed allows for more control and precise track placement, so this seems to be a good thingWell that's interesting. They're doing embedded track with the rail in place when they pour the concrete, as opposed to the method used on the VLSE where they poured the concrete, left a trough, and then installed the rail in the trough, securing it in place with an elastomeric grout. That explains the earlier image of the short section of complete track with the rail and flangeway fillers hanging out of it.
My non-professional opinion is the same. You have the rails gauged before the concrete is even poured. I strongly believe that TransEd had to bring in that milling machine because the rail wasn't quite properly gauged at locations on the SE line.I remember reading in one of the transforming Edmonton posts that casting rail in the bed allows for more control and precise track placement, so this seems to be a good thing