Jan 14
31527674773_f7949d711f_b.jpg


32188304832_2a876536ec_b.jpg


32188302722_c063669de2_b.jpg


31961450900_089f91c11b_b.jpg
 
Aug 12
Going strong
36543524355_d003f85244_h.jpg


36405884971_9c52a36a2f_h.jpg


36497178986_03ce606ae5_h.jpg


Becoming one with the neighbor.
35734485093_870923a356_h.jpg


On you terms.
35734480363_0aac95fa63_h.jpg


Keeping the streets clean and clear.
35734476683_9435b1a27b_h.jpg


35734466963_9429cc873d_h.jpg
 
Jan 27

26065519038_37142b946d_h.jpg


39039533985_2a2bfa9dee_h.jpg


From the McHugh FB page
Major props to James McHugh Construction Co team, Great Lakes Stair and Steel, Imperial Construction and Atlas Cranes for safely executing the erection of the 145 foot long, 250,000 pound pedestrian bridge at the 123 East Cermak jobsite. The bridge will connect pedestrians from the Hiltons at McCormick Place to McCormick Place Convention and Event Center.
26065512238_63cf28862f_h.jpg


26065507198_c3ce86666e_h.jpg


26065505398_76d278fa33_h.jpg
 

Back
Top