News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

hoggytime

Active Member
Staff member
Member Bio
Joined
Dec 7, 2023
Messages
695
Reaction score
347
Previous discussion on SSP Ottawa

Project Website

Location: 700 du Carrefour Blvd


First tower of a planned three tower project.


Screenshot 2024-02-02 163908.png
 
I wonder if it will actually get the fountain out front. Are there any functional private fountains left in Ottawa-Gatineau aside from at the Casino? I don't think the the one at The St. George on George St still runs. I haven't seen the fountain at the airport on post-covid. I'm pretty sure they got rid of the amazing fountains at Sun Life.
 
So the people with Ottawa facing units will have fewer windows than those facing the Gatineau Hills. Strange choice.
 
So the people with Ottawa facing units will have fewer windows than those facing the Gatineau Hills. Strange choice.
That little parking lot at the back might be used for a slim building eventually. Or they might be expecting other buildings to hide the view, this one's not that tall.
 
Looks like they have frames for eventual fake windows. Be prepared for a spandrel mess on a building that isn't even glass.
 

Back
Top