02/23/2024:
1.png

2.png

3.png

03/01/2024:
Balcony glass is going up at EX1.
4.png

6.png
5.png

7.png

8.png

9.png

10.png
 
I was hoping to have these up before I left for the US on Sat or post them while in the US but left the USB drive at home since I finally able to clean up my backlog.

March 5
Lot more up on my site now
53617586341_27464902ef_b.jpg

53617791973_7ac295e437_b.jpg

53617919549_311b4de962_b.jpg

53618032105_88d3f9830a_b.jpg

53618031835_da2f5f86b3_b.jpg

53617585566_4c2f3e51e2_b.jpg

53617791323_a1fe484c7d_b.jpg
 
Saw a presentation on this one at a conference, which suggested it was the largest project in Ontario (or maybe Canada(?) to use geothermal to provide energy for the HVAC and climate control.
 
May 01
At the rate they are going, the 4th tower should be at grade by Aug or sooner.

More up on my site
53709004619_62f6c36910_b.jpg

53708888733_2486592e55_b.jpg

53708888793_02ee2e5975_b.jpg

53708679181_83680cc57b_b.jpg

53708678926_4c0d709046_b.jpg

53708889228_3d5924608b_b.jpg
 