North America  |  Canada  |  Toronto
 6.1K   0   44 
U of T: UTSC Environmental Science and Chemistry
share  tweet  share 
  11 renderings
ENVIRONMENTAL SCIENCE FACILITY AT UNIVERSITY OF TORONTO

Diamond Schmitt designs second academic facility for U of T Scarborough

TORONTO – Diamond Schmitt Architects has won a design competition for the Environmental Science and Chemistry Building for University of Toronto Scarborough. This is the second building in a new campus precinct and is adjacent to the gateway Instructional Centre, also designed by the firm, which opened in 2011.

The 110,000-square-foot facility provides innovative design solutions for sustainable and highly flexible research and study space. The building connects laboratories and academic offices around a skylit forum and crossroads. The architectural character of masonry and curtainwall extends an identity established by the Instructional Centre and both buildings serve to strengthen the pedestrian realm along Military Trail with transparent and visual connection to the street.

“This project builds on our expertise in laboratory design to create a welcoming environment that is conducive to learning and scientific investigation,” said Donald Schmitt, Principal at Diamond Schmitt Architects. A modular design approach to the five floors of lab space ensures adaptability to the ever-changing nature of research and teaching methods while abundant natural light and an open concept configuration ensures clear sightlines.

Thematically, this building is inspired by nature to reflect both the academic pursuits of environmental science and chemistry as well as its setting on the edge of ravine. Vertical sunshades of varying depths enliven the façade with an organic built form that relates to the visual effect of a wind pattern on sand.

The building is targeting LEED Gold certification with sustainable features that include geothermal boreholes, an Earth Tube system to supply 100 percent fresh air to the administrative wing, unique fritted glazing to minimize solar heat gain, all LED lighting fixtures and a high performance curtainwall.

“The Environmental Science and Chemistry Building will be a landmark for academic excellence that will further strengthen UTSC’s rapidly growing campus and academic community,” added Schmitt. This technologically advanced building is being constructed on a fast track, Design Build contract in partnership with EllisDon. Groundbreaking for the $52.5 million facility takes place in early October and it is scheduled to open in July 2015.

Diamond Schmitt Architects (www.dsai.ca) has extensive experience in both laboratory and academic facility design, in addition to commercial, residential, health care and cultural commissions. Current projects include The Hospital for Sick Children Peter Gilgan Centre for Research and Learning, Public Health Ontario Clinical and Research labs at MaRS Phase II in Toronto and the Global Innovation Centre at Wilfrid Laurier University.

Find out how to promote this project on UrbanToronto
Expand/Collapse All   |   Export CSV
Project Information
Full data set available with a UTPro subscription
Earliest Application Date 0000-00-00 Construction Status Complete
Category Institutional (Education) Construction Began 0000-00-00
    Completion Date 0000-00-00
Address 1065 Military Trail, Toronto, Canada Other Addresses XXX XXXXXX XX, XXX XXXXXX XX
Latitude XXXXXXXXX Longitude XXXXXXXXX
Region XXXXXX Ward XX
MLS Zone XX    
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.

XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX

XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
Project Attributes
Full data set available with a UTPro subscription
FAR/FSI XXXXXX Crane Number XX
Site Area XXXXXX XX Heritage XXX
Number of Buildings    
Maximum Height 0 ft / 0 m    
Maximum Storeys 5    
Underground Levels X    
Project Companies
Developer University of Toronto
Builder EllisDon
Architect Diamond Schmitt Architects
Units
Full data set available with a UTPro subscription
Total Number Of Units Total Rental Units XXX
Building Units Hotel Units XXX
Market-Rate Rental Units XXX Freehold Units XXX
Condo Units XXX Other Units XXX
Unspecified Tenure Units XXX Affordable Rental Units XXX
    Rental Replacement Units XXX
Unit Mix
Full data set available with a UTPro subscription
Studios XXX    
1 Bedrooms XXX    
2 Bedrooms XXX    
3+ Bedrooms XXX    
Gross Floor Area
Full data set available with a UTPro subscription
Total GFA XXXXXX XX Office GFA XXXXXX XX
Commercial GFA XXXXXX XX Residential GFA XXXXXX XX
Industrial GFA XXXXXX XX Retail GFA XXXXXX XX
Institutional GFA XXXXXX XX    
Parking
Full data set available with a UTPro subscription
Total Vehicular Parking XXX Office Parking XXX
Residential Parking XXX Industrial Parking XXX
Visitor Parking XXX Institutional/Other Parking XXX
Retail Parking XXX    
    Bike Parking XXX
Access and Services
Full data set available with a UTPro subscription
Road Access XXXXXX XXXXXX Mass Timber XXX
Municipal Water XXXXXX XXXXXX Green Standards XXXXXX
Municipal Sanitary Sewers XXXXXX XXXXXX LEED Certified XXXXXX
Municipal Storm Sewers XXXXXX XXXXXX Passive Home Certified XXX
Other (Septic) XXXXXX XXXXXX    
Minimum Setbacks
Full data set available with a UTPro subscription
Front Lot Line Direction X Side Lot Line 1 Direction X
Front Lot Line Existing XXXXXX Side Lot Line 1 Existing XXXXXX
Front Lot Line Proposed XXXXXX Side Lot Line 1 Proposed XXXXXX
       
Rear Lot Line Direction X Side Lot Line 2 Direction X
Rear Lot Line Existing XXXXXX Side Lot Line 2 Existing XXXXXX
Rear Lot Line Proposed XXXXXX Side Lot Line 2 Proposed XXXXXX
Applications
Full data set available with a UTPro subscription
Primary Approval XXX
Submission Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
DevApp URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Application Types XXXXXX XXXXXX XXXXXXXXXXXX
XXXXXX XXXXXX XXXXXXXXXXXX
OLT URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Sub-Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Application #s XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
OLT #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
Appeal Received Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
MZO #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
OLT Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
MZO Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
Permits
Full data set available with a UTPro subscription
Links
Full data set available with a UTPro subscription
Website XXXXXXXXXXXXXXXXXX Registration XXXXXXXXXXXXXXXXXX
Email Social Media XXXXXXXXXXXXXXXXXX
Other XXXXXXXXXXXXXXXXXX    
Documents
Full data set available with a UTPro subscription
XXXXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXX-XX-XX
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX
XXXXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXXXXXXX-XX-XX
XXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX
Something is not right? Let us know!
Forum
Buildings Discussion
Views: 19K  |  Replies: 33  |  Last Post: Jul 06, 2020

Member Photos  
  44 photos

News