Allandale25
Senior Member
I would be very surprise if Brampton is willing to pickup the full cost of a tunnel, since Metrolinx made it known during the EA they would only fund it with the money that was to build the surface line. That will not even cover 20% of the cost of the tunnel.
They don't seem interested in a tunnel anymore. Since December 2018 they've talked about relocating the station to the north side of Steeles, just like the HMLRT EA had shown it. So it'll be interesting to see what publicly comes out next from that recent reference to design work that was passed by Brampton Council recently.