All of the elevated sections for the 403 overpass look like they are about to be put in place.
Lots of piers still have to be built. Then you still got to cap the ones being built before the beams can be place on them.

The 2 spans over Rathburn could see beams in place next week and well depend on the centre pier and weather. The centre pier has been under heating protection for most of the past week. Once that is done, they can deck those beams as well the ones in place. Back filling than take place to bring the line to grade at Sq One Dr.

If I am reading the site right, the area between the eastbound ramp to Hurontario and the 403 will be at an elevated dirt grade level to allow the line to do a T junction. Only the centre pier for the 403 is pour and cap with no end piers for the bridge.
 
Last edited:
There were staging areas for girders on Rathburn and the Hurontario overpass above the 403.
1.JPG
2.JPG

3.JPG
 
There were staging areas for girders on Rathburn and the Hurontario overpass above the 403.
View attachment 442786View attachment 442787
View attachment 442788
The those beam are for the ramp to City View follow by the ones to the centre column now the protection is now gone and then to the south Rathburn pier. Forming will start for the decking on top of the beams. All beams should be in place by Friday.

Watch for lane changes as well having to stop while the beams are being place.
 
Sorry for the crappy cell picture, but here is the Port Credit pushbox. Looks like waterproofing is happening on top of it. Push soonish?

View attachment 443522
it looks like the box is next to track 3 now with the track still to be install or it can be a walkway. The top is waterproof and only can be seen from the train or aerial shots. Those beams will slide on the box top while the box is being move.
 
Driving back from Florida this weekend. I hope they can wait until the following weekend for the push.
Safe driving back and no rush as the box will still be there until next weekend.
 