All of the elevated sections for the 403 overpass look like they are about to be put in place.
Lots of piers still have to be built. Then you still got to cap the ones being built before the beams can be place on them.All of the elevated sections for the 403 overpass look like they are about to be put in place.
The those beam are for the ramp to City View follow by the ones to the centre column now the protection is now gone and then to the south Rathburn pier. Forming will start for the decking on top of the beams. All beams should be in place by Friday.There were staging areas for girders on Rathburn and the Hurontario overpass above the 403.
View attachment 442786View attachment 442787
View attachment 442788
it looks like the box is next to track 3 now with the track still to be install or it can be a walkway. The top is waterproof and only can be seen from the train or aerial shots. Those beams will slide on the box top while the box is being move.Sorry for the crappy cell picture, but here is the Port Credit pushbox. Looks like waterproofing is happening on top of it. Push soonish?
View attachment 443522
Safe driving back and no rush as the box will still be there until next weekend.Driving back from Florida this weekend. I hope they can wait until the following weekend for the push.
Photo of the day award.Girders have been installed over Rathburn Road:
View attachment 443704
View attachment 443705
View attachment 443706
Photo of the day award.Girders have been installed over Rathburn Road:
View attachment 443704
View attachment 443705
View attachment 443706
I really like that third photo taken from underneath the girders!Girders have been installed over Rathburn Road:
View attachment 443704
View attachment 443705
View attachment 443706
Agreed. Is there a high def version for my wall.I really like that third photo taken from underneath the girders!