Random thought about watching the resumed Mill Woods testing, and keeping in mind I'm always suspicious of TransEd, I genuinely wonder what they're actually doing apart from having trains out for the sake of being able to say that they are testing trains. They aren't running 2 cars trains, they don't seem to run weekends (grounding cables in place on Saturday at the Whitemud so nothing could leave the shops that day at least) they aren't running into the evening. All they are doing is shuttling 3 trains back and forth between Mill Woods and about 51 Ave. I guess it's better than nothing, and it's their money, but I just see it as a way for them to claim they're running trains and testing the system.