Really got to laugh how this project got to where it is today with two cities fighting for different things that will cost taxpayers a lot more money than it should, servicing a lot less riders and adding longer travel time.
Most of all, it reinforced what I have being saying the last year that the line will not be done by year end of 2024 as planned with Metrolinx removing the completion date and having no new date for it. Looks like 2026 may see service from Steeles to PC by the loop while Brampton so called downtown section by 2030. The relocation of Steeles platform will happen now since nothing has been done for that area yet. Need to move a few things first.
I checked the Queensway intersection today on my way into Toronto and nothing has started. Work cannot start until there is a southbound lane in the southbound section and don't see that until February at the earliest with what must happen as well been cleaned up. Guild was working on pedestrian lights for the intersection and saw little of the corridor today.
I can see the option for splitting the line into two lines going ahead that will add extra travel time as well keep people in their cars or need to get one if they are/planning on using the Milton line, let alone bypass Sq One period. Riders going to/from Brampton GO Station will see some travel saving, but those coming from the north will see extra time if the buses loop at the GO station than Steeles as it will require transferring one system to another.
Will the extension cost be added to Metrolinx contract or go out for bidding with Metrolinx looking after the operation and maintains cost?
Just run a loop service and leave the rest of the line as it as well adding service that bypass Sq One 100%. Those who live or may live in the Eglinton area now and the coming decades that/may drive to/from the GO station will stay in their cars than deal with all the extra travel time and hassle doing so.
As for the loop itself, I am hearing the preferred option is Living Arts, but the EA has yet to start on it that may see it go down Duke of York as per the old EA for the line or Confederation as well.