Starting Jan 24 to March 14, all routes using Robert Speck intersection at Hurontario will be dealing with construction of the guideway. No right turns in any direction.
Route 2 N will be heavily affected as it will have to use Sq One Dr to get to CCTT because of this detour as it will have to deal with extra traffic to get onto Sq One Dr along with getting to City Centre to turn right. I did not see any notice for the Robert Speck Stop for southbound to see if the 2 S will use it during the construction or must use the 103 stop.
Looks like they have switched construction from the Queensway intersection as it is not ready to see construction that was to start Jan 8 until sometime in Feb. This means the city did not get its way of delaying intersections construction tell spring due to snow clearing issues.
Expect longer travel time for the 2's.
As far as I know, there was to be an T connection at Burnhamthorpe to all to have service to bypass MCC and this go back to early 2023.
Having an LRT going to Erindale GO Station is a waste of money, reduce the service for not only the line, but the 26 due to poor ridership numbers. Route 26 has poor numbers west of MCC since it came into existence.