Coolibop
Active Member
A where's Waldo for your photo tag! I'm still looking for the one above........and also Graffiti Alley. One day!.
A where's Waldo for your photo tag! I'm still looking for the one above........and also Graffiti Alley. One day!.
It's above the closest dirt pile on the right side.A where's Waldo for your photo tag! I'm still looking for the one above.....
Where would the tunnels exit? I thought aside from the land it's on being reclaimed, an issue was all the pipes wires and who knows what buried undergroundThis is where the Gardiner SHOULD have gone into a tunnel (like in Montreal) rising above ground east of downtown. Having a tunnel would have solved so may issues.
However that never happened so here we are.
Most people don't know how much of today's waterfront exists on reclaimed land that started in the late 1800's with the major push being 1900's. You may find some sunken boats like they did at CityPlace by Bathurst St when building the towers there, let alone the remains of wharfs.Where would the tunnels exit? I thought aside from the land it's on being reclaimed, an issue was all the pipes wires and who knows what buried underground
Its actually quite impressive to see how quickly they've moved on demolishing the barriers, while laying down fresh concrete and asphalt.April 29th update - asphalt laid.
Also, the land under where the CNE kids buildings were at the top of Centennial Park has been dug up. I'm assuming it's got to do with Gardiner work but I could be wrong with that.
View attachment 560101
I would've expected them to build the new concrete barriers before paving, I guess they'll be doing on top of the asphalt?Its actually quite impressive to see how quickly they've moved on demolishing the barriers, while laying down fresh concrete and asphalt.
I can point out numerous sites in the city where roads have been dug up and concrete has been poured, but yet asphalt hasnt been poured for weeks on end so there are indefinite lane closures.
I think what will happen is the east or westbound traffic will be moved into the middle section and actual work will commence on the vacated lanes.I would've expected them to build the new concrete barriers before paving, I guess they'll be doing on top of the asphalt?
You have, by far, the best photo tag/copyright telltale I've ever seen.It's above the closest dirt pile on the right side.
This one blends in even more thanks to the drop in resolution during the upload.
You have, by far, the best photo tag/copyright telltale I've ever seen.
Also, the land under where the CNE kids buildings were at the top of Centennial Park has been dug up. I'm assuming it's got to do with Gardiner work but I could be wrong with that.
Yeah, it's definitely on hold, I would say until at least after the Gardiner rehab is done since they need access underneath (where the extension will run) and the north end of the parking lot next to Centennial Park is being used for storage/offices for Gardiner work, which is also part of the extension route.I thought those were going as part of the streetcar connection between Dufferin & Exhibition Loops though that was on hold due to Ontario Line, so you may be right about it being Gardiner related.