Admiral Beez
Superstar
While dripping hydraulic fluid and rendering the track unusable.... apparently.whereas the larger machines - like the one used in the subway system - which can do it in one pass, and at a higher travelling speed, too.
While dripping hydraulic fluid and rendering the track unusable.... apparently.whereas the larger machines - like the one used in the subway system - which can do it in one pass, and at a higher travelling speed, too.
Nah that one was RT-41 the Tie Tamper that was built in 1993While dripping hydraulic fluid and rendering the track unusable.... apparently.
Give it time as thing don't happen at once as well some of the developers need to do one side first before the other side if they own the land.I'm excited to see this development, but why is the southside of Eglinton not being cleared and developed? There's a lot of parking lots and underutilized strip mall layout here.
View attachment 567980
A request filed by Global News for a list of ongoing problems, along with an attempt to view monthly construction progress reports by the contractor building the route, was denied.
Privacy officials with Metrolinx knocked two separate freedom of information requests about the line and claimed releasing the information could cause economic damage to the provincial government and even harm the future safety of the line.
The Metrolinx CEO also promised updates on the Eglinton Crosstown LRT every two months but has held just two briefings between September 2023 and May 2024.
I'm sticking to my 2023 prediction below. Crosstown achieves fully operational service in Apr-May 2025.I have a bet at the office for $50 that it will open before 2025. I made that bet in the winter of 2023. I hope I'm not about to lose $50!
I'm excited to see this development, but why is the southside of Eglinton not being cleared and developed? There's a lot of parking lots and underutilized strip mall layout here.
View attachment 567980
That sounds like a candidate for appeal to the Info and Privacy Commissioner.![]()
Metrolinx refuses to share progress and problems with Eglinton LRT - Toronto | Globalnews.ca
Metrolinx has rejected two access to information requests from Global News seeking progress reports on the long-delayed Eglinton Crosstown LRT.globalnews.ca
Agreed. There's clearly some significant issues.That sounds like a candidate for appeal to the Info and Privacy Commissioner.
Agreed. There's clearly some significant issues.
Rails are undersized as a result trains are prone to derailment
Automated system for the trains communicating with the system doesn't work underground
Many stations deleted waterproofing and used xypex concrete additive in areas with a fair amount of ground water. A couple if stations are constantly wet and rusting away
They are not sure how to fix any of these short of massive rework.
This all sounds apocalyptic.Many stations deleted waterproofing and used xypex concrete additive in areas with a fair amount of ground water. A couple if stations are constantly wet and rusting away
From the Toronto thread, someone who claims to have a source identifies a number of current issues:
I definitely want to hear from @smallspy on this.