Photos taken today, Friday (Nov. 1). Since I posted last Friday, not much progress apparent with the tower, at least externally. A few of the blue forms for the corners have moved up a level, to floor 62 or so. And some glass has been added to level 45 on the south side. Otherwise the blue forms on top are where they were last week, though the core may have moved up one level, around 74 or 75. The Rail Climbing Systems are at level 44.
A smaller batch of photos as not much is different...
First, the view from south on Yonge, by Dundonald, then closer to around Charles, and some of that new glass on the south face. The full view from in front of Holt Renfrew, then the view from Cumberland, east of Bay, including a tighter shot of those rising corner forms. The classic view from the NE corner of Bloor and Yonge, then finishing off with Bloor West at Bedford, and from down Devonshire.
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...
www.flickr.com
View attachment 609054View attachment 609055View attachment 609056View attachment 609061View attachment 609059View attachment 609058View attachment 609057View attachment 609062View attachment 609053