Mar 15
Burnhamthorpe station platform still not pour and look it still need some work on it before it can happen. All protected material has been remover it.
Still a large amount of work on the elevated guideway with retraining walls still to be built as well the base where the rail sit on. Amico was moving a lot of equipment around with most of it being remove from the elevated area. BOT trailers are still there with Amico trailer at the 403 bridge and hard to say who is doing what for the elevated area as well the wye area.
The have dug the base un 3 sections so far to support the ramp to Hurontario on the north side The base slab is no less than 4 feet thick with rebar on top of it to support the new retraining wall. 2 more section to to be form before pouring the concrete base. Do know if they gave up on using the Styrofoam blocks or will be used them near the connection to Hurontario south of the 403 off ramp.
Scissors lifts being removed from Rathburn ramp area and being place in the centre of the 403.
The last time I looked at the Rathburn ramp some weeks ago, still the same as last year. Today, the ramp has been backfill and ready for ductwork since it is stock pile for the ramp and the guideway still to be build to the station and the placement of the OS poles foundations.
Lot more photos up on my site