And here we go with another transit line in Ontario being slowed down do to tight turns/ curves in the alignment.
Let's list all the future rail transit projects that will probably experience something similar.
- Line 1 extension to Richmond Hill
- Bowmanville GO extension, GM plant spur
- Hamilton LRT, Dundurn st.
- Mississauga downtown loop
I hope the curves for the Ontario line are not too tight for the Hitachi trains. Specifically where the line runs between East Harbour and Exhibition.
Why does Metrolinx and Ontario transit planners not seem to understand that "trains + hard turns = bad"?
Look at the state of the Confederation line in Ottawa with the tight curves damaging the rolling stock.
Look at how slow Line 6 is when approaching and leaving Humber College.