News   GLOBAL  |  Apr 02, 2020
 8.4K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.7K     0 

  1. A

    Hamilton Toronto | Hamilton Line B LRT | ?m | ?s | Metrolinx

    The fact that it's taking this long to get construction on the Hamilton LRT going shows that the province isnt really that serious about this project. Early works have literally just started even though this project has been on the books for a long, long time (well minus the time the province...
  2. A

    Toronto Toronto | 316 Bloor West | 121.14m | 37s | State Building Group | Kirkor

    Glad to see that the province could care less about having situations like this. And i'll just assume since they were cheap enough to go with just 3 elevators here, they'll probably go with some cheap elevator cabs so 1 will probably be broken half of the time. This is appallingly bad and i'd...
  3. A

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    How long do we want to give it until the orange fins are value-engineered out? I'll say by 2026 those nice lovely fins will be replaced by some ugly steel-mesh type of fencing.
  4. A

    Toronto Toronto | Crosstown LRT | ?m | ?s

    At this point I dont even care anymore about these stupid "progress" percentage report updates. It's clear Metrolinx and Crosslinx are both completely lost and inept in terms of when the project will finally be complete and the whole thing is a mismanged screw up, where people do whatever they...
  5. A

    Toronto Toronto | Westdale | 134.7m | 40s | Sorbara | Graziani + Corazza

    That's great i'm glad they called out a whole bunch of issues in this proposal, because frankly this whole POS needs to go back to the drawing board. The city pretty much touched on the myriad of issues here and the whole layout of this plan is a dysfunctional mess. The cherry on top for me are...
  6. A

    Toronto 10 Ordnance Park | ?m | ?s | City of Toronto | DTAH

    Well this looks....completely unimaginative.
  7. A

    Toronto Toronto | 2485 Eglinton Ave West | 150.6m | 46s | Cityzen | gh3

    I mean to be fair, just take a look at the crap that Smartcentres is proposing just north of this one (Phase 1 of their Eglinton West development): I'm not holding my breath on this Cityzen proposal, but i'd love to be proven wrong!
  8. A

    Toronto Toronto | Blue Diamond Condos and Foxbar Towns at Imperial Village | 88.08m | 28s | Camrost-Felcorp | Diamond Schmitt

    I think the Notre-Dame de Paris will complete it's reconstruction before this one sees completion...and that's saying something because both almost started reconstruction around the same time.
  9. A

    Toronto Toronto | Cloverdale Mall Redevelopment | 156.9m | 48s | QuadReal | Giannone Petricone

    I highly doubt this is the case, that wouldnt make sense for a number of reasons. Cloverdale Mall is a revenue generator (not the greatest but they still generate some cash for QuadReal), so why would QuadReal shutdown the whole mall and lose out on all that cash flow until they fully build out...
  10. A

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Monday Mar 18th 2024 (you can see glass installation in progress on the bottom from this vantage):
  11. A

    Toronto Toronto | 180 Queens Quay East | 75.5m | 22s | Rom-Grand Waterfront Ltd | a—A

    Well I mean, that's pretty much what we've been striving for on Toronto's waterfront. Sterile and mediocre is the name of game for the majority of our waterfront unfortunately, and had it not been for Waterfront Toronto our entire waterfront would be the biggest embarrassment of any megacity in...
  12. A

    Toronto Toronto | 123 Portland | 49.3m | 14s | Minto Group | Sweeny &Co

    The attention to detail here is really great stuff all around, i've got to give credit to Minto and Sweeny on this project it looks solid.
  13. A

    Toronto Toronto | The Pemberton | 215.79m | 68s | Pemberton | a—A

    Not that i'm complaining, i'm in no rush to see another garbage project built by Pemberton to be completed.
  14. A

    Toronto Toronto | 50 Scollard | 147.62m | 41s | Lanterra | Foster + Partners

    Who knows it might become a new premium selling feature the way Toronto developers are. "Want windows for your unit? Good pay up another $20K and we can make it happen for you".
  15. A

    Toronto Toronto | Crosstown LRT | ?m | ?s

    The only form of staggered opening you'll see is between the openings of the Crosstown West project and the core Crosstown project. Asides from that, there will be no staggered opening.

Back
Top