  1. A

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    The tower is designed to resist loads through its mega columns and shear walls that are designed for the use of rebar. Filling out the concrete with as much reinforcement as possible is essential as this is the main source handling the tower’s load. Also the tower is designed to limit stress on...
  2. A

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Interior walls continue to fill up with rebar and formwork preparing for an upcoming 1000 cubic meter concrete pour.
  3. A

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Very excited to see how the diagonals are going to be placed.
  4. A

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Interior walls continuing to be filled with rebar. Elevator shafts for the main tower have also started to arrive on site today:
  5. A

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    @jibsta It gives better access to the 5th floor transfer, which is at a higher elevation than the 5th floor of the south podium where the slope starts.
  6. A

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Thanks for that nugget. Gotta get me some gelato. 👍
  7. A

    Toronto Toronto | 383 Sherbourne | 129.04m | 39s | NJS Capital | Arcadis

    Design is lazy. A few sharp features, but even those are downplayed. Less building coverage for the front exterior of the tower would look much better imo.
  8. A

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Interior wall structure for main tower from level 5 transfer up to level 6 taking shape today: