News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.6K     0 
  1. C

    Alto High Speed Rail

    Just left the consultation at Bayview yards, not a whole lot of new information since they're still so early in the process, but apparently Alto is not yet leaning one way or the other in regards to Union vs Tremblay, they're still considering things and listening to feedback. Also I'm pretty...
  2. C

    General Update/Rumour Thread

    As a student at uOttawa, I am very interested in this... Thanks for the update!
  3. C

    Alto High Speed Rail

    Ultimately I don't think I would be too disappointed if they did end up choosing the Tremblay station, it has a connection to the O-train which lessens the fact that it's fairly out of the way, but I think I'd still prefer Union station, if for no other reason than i think rail infrastructure...
  4. C

    Alto High Speed Rail

    You could probably make an underground connection to the Rideau O-train station from Union station. I am extraordinarily doubtful they will use Union station but I would love it if they did. Guess we all need to make a big fuss at all of the consultation meetings and online surveys about our...
  5. C

    Odenak | 665 Albert St. | 105+120m | 31+36s | Dream+Multifaith | Perkins&Will+KPMB+Two Row | U/C

    They've also started the paneling on the east tower And some more shots of the West tower from the train
  6. C

    The Residences at Island Park Drive | 1451 Wellington St. | 39m | 12s | Mizrahi | IBI+Arcadis

    Not the best photos but there's a crane on site now (the small one, not the giant one at a different construction site in the background), and I spotted some workers on the top floor.
  7. C

    Ryse | 1950 Scott | 72m | 22s | Colonnade Bridgeport | Hobin

    Didn't get a photo but they've got a ton of rebar in place at the bottom of the excavation now.
  8. C

    General Update/Rumour Thread

    I thought I last heard that there wasn't gonna be a high-rise on the LCBO site, guess that was wrong. It's gonna be a heck of a block when that's done....
  9. C

    Andaz Ottawa Byward Market | 59m+60m | 16s+17s | Claridge Homes | NEUF

    Forgot to post this earlier, first floor has risen. Taken on November 1st:
  10. C

    Lansdowne 2.0

    Why not? Is it just the lack of accessibility? Because I haven't heard any other good reason for this.
  11. C

    Azure Westboro | 2070 Scott St. | 83.4m | 26s | Azure | BDP Quadrangle

    Still some finishing touches that need to be finished....

Back
Top