News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.5K     0 

  1. dowlingm

    VIA Rail

    Wasn’t aware of the DEMU pitch. Are UPX MUs required to do locomotive-cadence inspections, and would that be required for MUs without cabs? As for VIA costs, the choice to go with cabs created a class of coach which can’t easily be swapped between roles. I doubt it was cheap. How much is the...
  2. dowlingm

    GO Transit Fleet Equipment and other

    1. Separate HEP as the existing F59 setup does 2. This would be more about having a cleaner engine than a more powerful one and if the battery thing goes through there may be QSK60s looking for something to do
  3. dowlingm

    GO Transit Fleet Equipment and other

    To be clear I was only suggesting 1 QSK each (2700hp) so for L6s
  4. dowlingm

    GO Transit Fleet Equipment and other

    I speculated about putting in ex MP40 QSK60s plus a HEP engine, but that was on the premise of moving forward with a battery pilot on the donors, and as @smallspy noted the mount points would have to work too Will be interesting how many good locos come from all these Metrolink units - almost...
  5. dowlingm

    Ontario Northland/Northern Ontario Transportation

    Nobody can buy locomotives from Idaho any more. Maybe from Erie, where Wabtec's blueprints live now. As far as LD trains go, one thought would be for VIA to consider freight locomotives on the head end and a generator coach behind, if that would allow them to leverage CN parts depots along...
  6. dowlingm

    VIA Rail

    I believe that even if Siemens wins the LD fleet order, it will be with a Amtrak Midwest config (MU/COMM) rather than Corridor/CAT5 simply because Siemens like the other manufacturers will not want to deliver all of VIA's requested car types at once, and that means being able to interoperate...
  7. dowlingm

    VIA Rail

    First of all, VIA tendered for trainsets - power and coaches together. Wabtec (or EMD with F125) would have had to partner with a coach builder. Bombardier could have put forward a diesel only ALP45 but they didn't have a ready to go coach model (and their ones for CTDOT were quite expensive I...
  8. dowlingm

    VIA Rail

    According to groups.io (Lion Liu) the F40 will be dead in tow when at the rear, and was chosen as opposed to P42 due to being lighter.
  9. dowlingm

    Ontario Northland/Northern Ontario Transportation

    Doug Bardeau at groups.io posted the 2010 Northlander schedule. Here's the southbound: Dep Cochrane 0720, Porquis Jct 0820, Matheson 0855, North Bay 1355, Washago 1630, arr Toronto 1915. Shuttle Timmins 0745 South Porcupine 0755 Matheson 0840. So it's likely that there will be two or more...
  10. dowlingm

    GO Transit: Service thread (including extensions)

    FRMCS pilot user (Finland) https://www.globalrailwayreview.com/article/140306/finland-fast-track-frmcs/ One of the things I have wondered about is the ability for the railways and commercial mobile network operators to cooperate not merely for onboard wifi but for signalling, and thus expand...
  11. dowlingm

    Ontario Northland/Northern Ontario Transportation

    One wonders what the ONR planners are thinking now that some VIA Ventures are running with F40s at one end. Might need more than two APCUs up there soon...
  12. dowlingm

    Port Colborne Toronto | Lithium-ion Battery Separator Plant | ?m | 1s | Asahi Kasei

    isn't the issue (or an issue) with sodium that they are still significantly heavier in kg/storage capacity than lithium? Given electric vehicle weight is already an issue with lithium, I would think fixed storage would be the more likely usage for at least a few years.
  13. dowlingm

    Finch West Line 6 LRT

    Have been catching up on this thread and a few points: A Bolton GO train station at Emery was mentioned a few times. I think Bolton GO would be a good project but Metrolinx clearly doesn’t, at least not in the foreseeable future. Look at the times they have produced maps lately with pencilled...
  14. dowlingm

    GO Transit: Union Station Shed Replacement & Track Upgrades (Zeidler)

    What does the HSR enterprise generally contribute to the capital and operating budgets of the relevant track corridors and stations, in such cases? I have noted before that Alto would be benefiting from Ontario's and Toronto's combined investments in the USRC and Union Station, but requiring...
  15. dowlingm

    Finch West Line 6 LRT

    and yet that same arrangement did not save the Flexity downtown order.

Back
Top