News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.1K     0 

  1. GameOnBrad

    Finch West Line 6 LRT

    There is a very easy and clean solution to fixing the line 1 electronic displays but it would take some reworking. I always found it funny how large the lights were. They could easily just create a new board with lights 50% smaller and it would easily solve the clutter. That said, they could...
  2. GameOnBrad

    Toronto Toronto | Regent Park: Daniels on Parliament | 88.25m | 25s | Daniels | Superkül

    I bet it will likely coincide with the Regent Park Phase 4 and Phase 5 developments. Let's face it, if they put a bike lane in along that strip now, it would likely be blocked with the many phases of construction for many years as is almost always the way it works.
  3. GameOnBrad

    Finch West Line 6 LRT

    On line one. Electronic displays were updated...
  4. GameOnBrad

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    On line one. Electronic displays were updated...
  5. GameOnBrad

    Finch West Line 6 LRT

    People always flock to what is shiny and new. You see it all the time with new eateries. Those individuals cannot really be trusted with an unbiased opinion when they are largely there searching for the new experience for a dopamine hit. There are also a whole bunch of people on social media...
  6. GameOnBrad

    Finch West Line 6 LRT

    That way I always check if an LRT, or even a bus, I'm on is going to slow is to look out the window at the cars. If the cars are passing the LRT/Bus, it's going too slow. 😑
  7. GameOnBrad

    Toronto Toronto | Cielo Condos | 120.5m | 34s | Collecdev-Markee | KPMB

    Saw a crane. Swung by today... as is always the case with me...
  8. GameOnBrad

    Toronto Toronto | QueenChurch | 186.5m | 57s | Tridel | Kirkor

    They are at ground level already and it looks like they are prepping the supports for the first floor...
  9. GameOnBrad

    Toronto Toronto | 241 Church | 170.7m | 53s | Graywood | Turner Fleischer

    It looks like they are already prepping for the second floor pour...
  10. GameOnBrad

    Toronto Toronto | Pinnacle Lakeside (Phase 1) | 174.86m | 54s | Pinnacle | Hariri Pontarini

    Well, they are still building ...and burning down...
  11. GameOnBrad

    Toronto Toronto | One Thirty Eight | 144.05m | 31s | Cityzen | BBB

    This build is weird. Some parts are still underground, while some are at ground level and now some pillars are going up at ground level...
  12. GameOnBrad

    Toronto Toronto | The Pemberton | 215.79m | 68s | Pemberton | a—A

    More and more glass panels and black metal mesh styling on the ground floor and it loojs like the floors are moving faster now that that giant floorplate is done...
  13. GameOnBrad

    Toronto Toronto | Regent Park: Daniels on Parliament | 88.25m | 25s | Daniels | Superkül

    North side is almost fully open and you can walk down Dreamers now...
  14. GameOnBrad

    Toronto Toronto | Ookwemin Minising | ?m | ?s | Waterfront Toronto

    Contacted 311 again but this time for the yellow bridge over the ship channel. The other report I filed was for the red and orange bridges. A lot of these black tags are the same person/people based on the writing...

Back
Top