Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
GLOBAL | Apr 02, 2020
A Message to Our Readers
11K
0
News
GLOBAL | Apr 01, 2020
EarthCam Time-Lapse Documents Rafael Viñoly-Designed New Stanford Hospital Construction
43K
0
News
GLOBAL | Apr 01, 2020
Resort Town
6.6K
0
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
I
IRT_BMT_IND
replied to the thread
TTC: Other Items (catch all)
.
The closures were because of snow blocking (insulating) the third rail. I rode the subway north of Bloor today and in the a lot of the...
Jan 27, 2026
I
IRT_BMT_IND
replied to the thread
TTC: Other Items (catch all)
.
I would guess the TTC can't turn the power off at Union without turning it off at King. I know when Andy Byford was in charge they...
Jan 23, 2026
I
IRT_BMT_IND
replied to the thread
TTC: Automatic Train Control and Subway Platform Screen Doors
.
The half height doors would (I assume) not have the same fire code implications as full height doors. Seeing how they are pretty much...
Jan 23, 2026
I
IRT_BMT_IND
replied to the thread
Ottawa Transit Developments
.
I wonder if the easiest fix at this point is to just replace these trains with a better design. While scrapping essentially brand new...
Jan 22, 2026
I
IRT_BMT_IND
replied to the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
10-15 minutes from Mount Dennis to Cedervale and 40-45 minutes from there to Kennedy would fit. This is also assuming the first...
Jan 22, 2026
I
IRT_BMT_IND
replied to the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
That sign also reveals the round trip time between Cedervale and Kennedy is about 90 minutes including a layover at Kennedy. So probably...
Jan 22, 2026
I
IRT_BMT_IND
replied to the thread
TTC: Other Items (catch all)
.
Trains can operate in emergency mode without supervision of the signal system. The question is whether it is a good idea, the TTC using...
Dec 31, 2025
I
IRT_BMT_IND
replied to the thread
VIA Rail
.
Coteau only has a platform on the south track. So train 35 may have had to wait for train 62 to pass to cross to the south track to...
Dec 31, 2025
I
IRT_BMT_IND
replied to the thread
GO Transit: Service thread (including extensions)
.
The 30 minute service is showing in the GTFS feed starting on January 5.
Dec 31, 2025
I
IRT_BMT_IND
replied to the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Sheppard was way less complicated. Eglinton among other things has been a systems integration nightmare. Some of this is due to newer...
Dec 12, 2025
I
IRT_BMT_IND
replied to the thread
Alto - High Speed Rail (Toronto-Quebec City)
.
One thing to keep in mind is that HSR doesn't really need massive terminal stations. Probably 4 tracks would be enough.
Dec 10, 2025
I
IRT_BMT_IND
replied to the thread
Finch West Line 6 LRT
.
For Finch even without signal priority just having trains run at the speed limit of the road and not cross intersections at 25 km/h...
Dec 10, 2025
I
IRT_BMT_IND
replied to the thread
Finch West Line 6 LRT
.
My guess is the 30 Lambton which used to have hourly service in the evening.
Dec 6, 2025
I
IRT_BMT_IND
replied to the thread
TTC: Other Items (catch all)
.
Going east from Yonge this usually happens at Broadview, for headway control at the interlocking signal, Coxwell for crew changes, and...
Dec 2, 2025
I
IRT_BMT_IND
replied to the thread
TTC: Other Items (catch all)
.
The inverters in this case were I'm pretty sure for the lighting and other auxiliary power, not the actual propulsion system which was...
Nov 23, 2025
Members
Back
Top