News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6.3K     0 

  1. J

    Finch West Line 6 LRT

    ION also only built the shelters on half the platform length at the start since the full length of the platform wouldn't be needed for trains until years later.
  2. J

    Ontario Northland/Northern Ontario Transportation

    The Northlander sets are going to stable in Cochrane. After a brief rest upon arrival at Timmins-Porcupine they'll change ends and go back through Porquis Junction taking the north leg of the Wye to Cochrane. Once in Cochrane the train will be reversed into the existing servicing yard, serviced...
  3. J

    Finch West Line 6 LRT

    The Line 6 Finch West corridor is as dense as the iON LRT corridor and many said it didn't need an LRT either, yet the iON LRT is the most used transit route in KW now and is spurring further development along the corridor and the Region there is moving forward with it's stage 2 expansion down...
  4. J

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    I do know that according to Steve Munro, they are making staffing and crewing adjustments on Line 1, 5, and 6 this coming board period adding "Service Assistance Crews". So my guess is the issues they want to fix are more operational in nature than anything else.
  5. J

    Finch West Line 6 LRT

    Respectfully... Shut Up. This is a new line experiencing all the new line issues. Issues that will be worked out the longer it operates in revenue service. Your continuous beating of the dead horse is not going to change anything. These stops don't need to be removed to improve service. All you...
  6. J

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    They need to cut and cover so they can do the TBM extraction for the Pape tunnel TBMs
  7. J

    Ontario Northland/Northern Ontario Transportation

    not necessarily. There's an almost 19 hour gap between when the northbound train arrives in the North and when it's needed again for the southbound trip. It is proposed to arrive at 0510h at Timmins-Porcupine and depart again at 0015h that's enough time to run the rail connection to Cochrane...
  8. J

    Ontario Northland/Northern Ontario Transportation

    The trainsets are going to layover in Cochrane. Once they get to Timmins-Porcupine the crew will change ends and go back through Porquis Junction north to Cochrane.
  9. J

    Ontario Northland/Northern Ontario Transportation

    3 Siemens Venture sets were ordered. 2 will operate concurrently with a 3rd for a spare.
  10. J

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    if the original plans were followed through with Line 1 would have had a station built in between Lawrence and Eglinton at Glencairn/Yonge and in between Lawrence and York Mills at Yonge Blvd / Glen Echo. Instead they decided to parallel the subway with the 97 Yonge bus to save money
  11. J

    Finch West Line 6 LRT

    Happens with a lot of embedded track switches Ice chunks get trapped between the switch blades and impede their ability to move fully by the looks of it they didn't install an electric switch heater there since a lot of those crossovers are so infrequently used so that just makes the problem...
  12. J

    Finch West Line 6 LRT

    Lawrence won't get higher order transit because it's too close to Line 5 Eglinton. Wilson/York Mills won't get one because it's too close to the planned Line 4 extensions. Don Mills is getting the Ontario Line, and Finch East has the potential to get a Line 6 extension east. Jane is getting...
  13. J

    Finch West Line 6 LRT

    Ottawa also runs theirs on twice the Line 6 nominal voltage (1 500 V DC for Ottawa vs 750 V DC for Line 6) which not only allows the trains to be paired together but also have a much more aggressive acceleration curve.
  14. J

    Finch West Line 6 LRT

    The Flexity Freedoms are built better tbh and since they've been running in revenue service in 2 municipalities in Canada since as early as June 21, 2019 (and the 7 module variant, both in single and paired operation in Edmonton since November 2023) and they have never experienced the same kinds...
  15. J

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Edmonton didn't though. A trip on the Valley Line LRT from Mill Woods to 102nd Street takes 30 minutes.

Back