  1. J

    Eglinton East LRT | Metrolinx

    Yea my apologies if I don't believe this part one bit. We've been burned far to many times by Metrolinx to trust that there is any sort of service improvement coming to any GO line in Scarborough or the rest of the GTA for that matter. They have been at it for 10 years and what do they have to...
  2. J

    Eglinton East LRT | Metrolinx

    I wonder what "provincial priorities" prevent the use of the Conlins site. Redevelopment? Trying to cram a yard for the Sheppard Line in there? or are they just actively trying to sabotage the project?
  3. J

    GO Transit Electrification | Metrolinx

    I think we just need to acknowledge that Ford & Co just don't care about GO Electrification, to them the current diesel service gets the job done. I would also pose a possible conspiracy here, and that is there is a conflict between his car-centric nature and his developer buddies... let me...
  4. J

    TTC: Other Items (catch all)

    They also got the Orion VI's at the time which were the last hurrah of CNG buses in the city and riddled with problems. At that time the TTC was testing out the New Flyer D40LF, the Orion VI, and they also had a demonstrator Nova LFS40. I know the TTC liked the D40LF's and would have preferred...
  5. J

    Eglinton East LRT | Metrolinx

    I can't believe there are people here who honestly believe terminating an Eglitnon east line at Brimley is a good idea. Basically for people who want to continue their journey along Eglinton you are forcing them to make not 1 but 2 linear transfers. They would need to transfer onto Line 2 at...
  6. J

    Eglinton East LRT | Metrolinx

    Realistically speaking the stop at the stop at Lawrence and then the short stretch along Morningside between Kingston Road and the Highland Creek Ravine, with the line the coming to the surface to cross the ravine on a dedicated bridge. The underground section on the Crosstown exists because...
  7. J

    Transit Fantasy Maps

    Made some new maps; these looking at the proposed ICTS line along Eglinton from 1973. Back then the TTC was examining routes along Eglinton and by 1973 they had proposed constructing a line from Weston Road to Bellamy Road along Eglinton Avenue. However unlike the previous subway proposal from...
  8. J

    Waterfront Transit Reset Phase 1 Study

    Ok but there are a couple of issues with your bi-articulated bus idea, firstly where would we maintain these bi-articulated buses? None of the city's bus garages are equipped to handle 80' buses meaning that one of the garages in the city would need to be retrofitted with new equipment solely...
  9. J

    Waterfront Transit Reset Phase 1 Study

    I think it has more to do with giving each route its own platform area since Union will be the terminus of 3 routes the 509, 510, and the East Bayfront line with a fourth platform serving as both an unloading platform as well as future proofing for a potential Bremner route.
  10. J

    Waterfront Transit Reset Phase 1 Study

    Ok so what number do you think this route will get? Come one 513 East Bayfront, it's unused and it's the number I picked for it in my fantasy proposal. Or do we bring back the 514? or do we just change up how the Streetcars are numbered all together?
  11. J

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Perhaps I am misunderstanding here, but the site of the current Eglinton bus terminal is the old Eglinton Garage which opened as a Streetcar Carhouse in 1922 and then became a full-time bus/trolley bus garage in 1954 before finally closing for good in 2002. So as far as I am aware its not the...
  12. J

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    I don't think this will be a long-term issue since earlier in the thread plans for redevelopment of the old terminal site include a new and presumably more appropriately sized bus terminal under the development.
  13. J

    Waterfront Transit Reset Phase 1 Study

    There's an even easier solution to this problem, that's to stop calling the East Bayfront LRT an LRT because it's literally not; it's just an expansion of the streetcar network. When we constructed the tracks along Sumach for the PanAms nobody batted an eye and it was built without much fuss. If...
  14. J

    Ontario Line Extension West of Ontario Place (Speculation)

    --- Long post ahead --- Since we are talking about a Dufferin alignment I made a map to visualize it and while it has merits I think it also has issues. Firstly is the cost as stated in my last post since the overwhelming majority of this extension would need to be built underground. Secondly I...
  15. J

    Ontario Line Extension West of Ontario Place (Speculation)

    I think the biggest issue with the Dufferin corridor would be cost since there is no room for any kind of at-grade or elevated alignment south of Wilson so the entire extension from the Exhibition to at least Wilson would need to be underground. While there is ridership potential on the corridor...