News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

  1. K

    Toronto Toronto | Minto Yorkville Park Condos | 75.89m | 25s | Minto Group | IBI Group

    A temporary/permanent staging platform will not be present here.
  2. K

    Toronto Toronto | TeaHouse 501 Yonge Condominiums | 170.98m | 52s | Lanterra | a—A

    The entire tunnel will be exposed during construction to have it inspected by TTC personnel and once all is well, the tunnel within the site will have new waterproofing applied. Once that's done, the structure can be built up around it. Also as part of this development, an additional ventilation...
  3. K

    Toronto Toronto | The Madison | 121m | 36s | Madison Group | Kirkor

    Yes. Underway as we speak.
  4. K

    Toronto Toronto | Montgomery Square | 84.12m | 27s | Rockport Group | RAW Design

    Helendale is closed for this sites' construction until December 2017.
  5. K

    Toronto Toronto | Vox Condominiums | 115.82m | 35s | Cresford | a—A

    fyi, this slab you see is to facilitate construction staging and a turn around area for vehicles. The amount of construction staging area that will be present between the property and hoarding allows for zero vehicular access if this wasn't built.
  6. K

    Toronto Toronto | Ten York Street Condos | 224.02m | 65s | Tridel | Wallman Architects

    This building is going to have two hoists. One on Harbour (half in the lane), one on Lake Shore (in the site though, no lanes closed).
  7. K

    Toronto Toronto | Whitehaus Condominiums | 107.28m | 31s | Lifetime | Turner Fleischer

    Does anyone know when the buildings on Yonge are coming down? I see theres an approved application to take down the old rental buildings but not seeing an application yet to pull down the yonge stores....
  8. K

    Toronto Toronto | 155 Redpath Condominiums | 120.39m | 34s | Freed | a—A

    Ah, i wish i was MOL. I'm wondering what it's going to take before they get some overhead protection in the NE corner of the site. No covered walkway and work happening above and adjacent. Illegal.
  9. K

    Toronto Toronto | 50 at Wellesley Station | 114.9m | 37s | Plaza | BDP Quadrangle

    lol, the front page on this is wrong. That article is looking at excavation beginning at VOX, not 50 Wellesley and SHORING/DRILLING at 50 Wellesley.
  10. K

    Toronto Toronto | Backstage On The Esplanade | 116.73m | 36s | Cityzen | P + S / IBI

    waterproofing any concrete structure such as what we have here requires tar based materials, then fused together with heat, aka fire and it caught fire - happens occasionally.
  11. K

    Toronto Toronto | Massey Tower Condos | 206.95m | 60s | MOD Developments | Hariri Pontarini

    The anticipated completion date (approximately) is December 2019, fyi.
  12. K

    Toronto Toronto | Art Shoppe Condos | 98.75m | 28s | Freed | a—A

    covered walkway going up here. looks like demo is imminent.
  13. K

    Toronto Toronto | 150 Redpath Condominiums | 132.28m | 38s | Freed | a—A

    Fence is up around the corner house. I'd say demo is imminent.
  14. K

    Toronto Toronto | eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Crane #1 going up here today
  15. K

    Toronto Toronto | 155 Redpath Condominiums | 120.39m | 34s | Freed | a—A

    second crane going up here today.

Back
Top