News   GLOBAL  |  Apr 02, 2020
 8.6K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.8K     0 

  1. MatiasBessai

    Toronto Toronto | 28 Eastern | 45.4m | 12s | Alterra | Teeple Architects

    News Release from Alterra, published June 12th, see transcript below: ALTERRA AND ROBERT COOPER, CEO, APPOINT STUART WILSON AS NEW COMPANY PRESIDENT Developer makes strategic move for company’s long-term succession strategy [TORONTO, June 12, 2023] – Alterra Group of Companies, a leading...
  2. MatiasBessai

    Toronto Toronto | Westbend Residences | 44.08m | 13s | Mattamy Homes | BDP Quadrangle

    Photos from this afternoon. Excavation is underway to bring the whole site down to the level of the TTC parking lot on the northern border. After that, they are planning to drill boreholes for the geothermal heating system. Look for the full report on the front page tomorrow.
  3. MatiasBessai

    Toronto Toronto | Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

    While attending the Geese installation ceremony I was able to get a couple of shots of the construction of the new food hall, located down on the lowest level at the southernmost end of the mall. Still looking quite preliminary behind the tarp, no new framing up yet. The rectangular pit could...
  4. MatiasBessai

    Toronto Toronto | The Twelve Hundred | 29.32m | 8s | Fieldgate | Arcadis

    Shoring walls going in as of this afternoon.
  5. MatiasBessai

    Toronto Toronto | KESKUS Estonian Cultural Centre | 17.07m | 3s | Kongats

    Taken this morning, a lot has changed since the site was last pictured here.

Back
Top