    Toronto Toronto | KING Toronto | 57.6m | 16s | Allied | Bjarke Ingels Group

    Dec 2025 Dec 2024 So they have done 3 floors of cladding in the last year. At this rate it will take them over 3 years to finish the cladding. It's amazing how long it takes for anything to be built in this city.
  2. O

    Finch West Line 6 LRT

    Translink only has 1 sky Translink only has one sky train expansion plan for the next 15 years after the current constructions are completed and that's to extend the Millennium Line to UBC, all other transit upgrades are BRTs Priority BRT Corridors
  3. O

    Finch West Line 6 LRT

    The entire point of transit city was to bring higher order of transit to the burbs all at once.
  4. O

    Finch West Line 6 LRT

    I am glad city officials are the one taking much of the heat for this mess and not metrolinx. They have had all this time to speed up rail transport in the city ie streetcars and have refused to. so it nice to seem them fumbling over themselves now that the public is fully aware of what they...
  5. O

    Finch West Line 6 LRT

    why the hell are they doing a study??? Just make the change then study it. Maybe the city should have used all that time they were bitching at Metrolinx about an opening date they should have been studying TSP so that it would be implemented while test started.
  6. O

    Finch West Line 6 LRT

    Well Line 5 is their first line, i would say the learning are already seen on the Ontario Line construction. namelly building the stations first since they take the longest time than after the TBM have gone through like on Line 5. This change alone will save 2 years of construction
  7. O

    Finch West Line 6 LRT

    If it was pitched at current speeds, 15 to 30 minutes slower than the buses it replace, it would have never been approved as a transit project anywhere. even 33 minutes is the same speed as the bus.
  8. O

    Toronto Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    It seems like the opening of this line is in a perpetual 3 months away. At least the West extension is visbile moving ahead at a good pace, still shocked it will not open until 2031
  9. O

    Toronto Toronto | BMO Field Renovations | ?m | ?s | MLSE | Gensler

    If its that much then they can make permeant the north end changes for the world cup in 2027.
  10. O

    Toronto Toronto | BMO Field Renovations | ?m | ?s | MLSE | Gensler

    BMO field end zones have always been 2 yards shorter (4 Yards total) than league standard. The CFL are changing the field size to 100 yards in 2027 from 110 yards now. So it will mean a net change of 6 yards (5.5m) smaller field that can go into BMO than today
  11. O

    Eglinton East LRT | Metrolinx

    Just build a median running BRT with stations like York Region and upgrade later is the need arises. No need for extra funding by higher level of government and can be done in a year. The city needs to get away from subway and LRT building and more into median running BRT only lanes with station...
  12. O

    Toronto Toronto | BMO Field Renovations | ?m | ?s | MLSE | Gensler

    How much more will BMO CFL field get? MLSE certainly knew about the change ahead of time and could have gotten specials dispensation if they wanted to incorporate the change to BMO if it was significant.
  13. O

    Toronto Toronto | BMO Field Renovations | ?m | ?s | MLSE | Gensler

    BMO already had a shortened CFL field so i don't think the rule change will allow BMO to shorten the CFL field.
  14. O

    Finch West Line 6 LRT

    Waterfront LRT and Eglinton East LRT are still to come. My preference is that both should be BRT however.
  15. O

    Waterfront Transit Reset Phase 1 Study

    So we are half way there it seems, just extend the busway to the port lands and use the LRT bridges and call it a day