The grid of the balconies on the tower looks good next to the lattice facade on the older tower next door.
That transitions well from the solid limestone facing University to the new glass box up top.
There really should be an awning to mark the office entrance.
No awning in the 2022 rendering:
https://retail-insider.com/bulletin/2022/04/lululemon-to-open-3-level-flagship-store-at-yonge-and-bloor-intersection-in-downtown-toronto/
The area where the red crane is sitting, bordered by the rows of cassions, will be excavated down to form a pit for TBM removal and eventually the portal.
From the Portal thread: