  1. Q

    Oakville Toronto | Neyagawa Crossings | 68.05m | 18s | Sky Property Group | Kirkor

    I would say it's definitely planned in the long term, 2034+. There was a EA report from decades ago. This is latest tender worth $11,210,070.00 for this project: Provision of Engineering Services for MCEA Addendum, Preliminary & Detailed Design, Contract Tender Preparation, Contract Admin...
  2. Q

    Milton The Laurels | 51.6m | 15s | Mattamy | Core Architects

    On Jan 24th, before the snowstorm spotted a new crane on the site @Paclo @interchange42
  3. Q

    Milton Toronto | Excelligent Long Term Care | 34.8m | 8s | Mr. Rob Colbeck | G Architects

    Slow-moving project, I have observed not alot of activity while driving by lately.
  4. Q

    Milton Toronto | Creekside Condos | ?m | 6s | York Trafalgar | ATA Architects

    First building looks to be close to completion. No cranes left for a few weeks now. @Paclo @interchange42
  5. Q

    CN Milton Logistics Hub

    The Town of Milton and the Region of Halton were strongly opposed to this project, so the EA didn't consider the traffic from the CN project in its Traffic Volume Data. It was originally as in the 2014 EA, six lanes from Tremaine Road to Regional Road 25 (starting in 2014) and a phased widening...
  6. Q

    CN Milton Logistics Hub

    The bridge supporting the Britannia Access Road and the road itself look to be close to completion. Intersection modifications at Britannia Road to create a new truck entrance are close to completion as well. There are new turning lanes, traffic signal adjustments, hydro pole relocations, and...
  7. Q

    Milton Milton Education Village & Laurier Milton Campus | ?m | 12s | WLU

    Had the time today to go take some pictures from the sidewalk, didn't go up close to the fence as there were workers nearby running electrical equipment. Looks to be mostly complete, some exterior glass work and minor landscaping remain, not sure about inside. Hiring for Registered Practical...
  8. Q

    Milton The Laurels | 51.6m | 15s | Mattamy | Core Architects

    I think that's only for the deposit portion, where it's fixed monthly, instead of being 5% every few months or so for 20-25% deposit.
  9. Q

    Milton The Laurels | 51.6m | 15s | Mattamy | Core Architects

    Mattamy seems to offer more market-competitive pricing and financing incentives on its condos than others, and it's been 13 months since release. Even their SFD launches often sell out faster than other builders in the area, although they are known for subpar finishes.
  10. Q

    Milton Toronto | 130 Thompson Condominiums | 106.7m | 31s | Greenpark | Graziani + Corazza

    To address the fact that the 3rd building sales haven't started and that it seems to be close to topping off. I was wrong. There have been rumours going around on social media (Reddit and FB) that the 3rd building either won't be finished inside or will be converted to rental. 2nd building sales...
  11. Q

    CN Milton Logistics Hub

    Halton didn’t standardize Lower Baseline to Eglinton mainly due to lack of any development in the corridor. Unlike Toronto and Mississauga, which were urbanizing rapidly and needed consistent arterial names for traffic and postal purposes, Halton remained largely rural farmland for much of the...
  12. Q

    Roads: Ontario/GTA Highways Discussion

    Been a few weeks now, open since July 7th, was posted here earlier in the thread and more in the Highway 401 Widening - Highway 8 to Highway 410 thread. The bridge was demolished on the 13th.
  13. Q

    Roads: GTA West Corridor—Highway 413

    Yep especially traffic heading to and from the west (Oakville, Burlington, Niagara Region) will end up getting off at Trafalgar or James Snow to take Hwy 25 and clog up the roads in Halton to get to the QEW. Traffic heading east has the 401. Would likely demand a high price tag considering it...
  14. Q

    Roads: Ontario/GTA Highways Discussion

    They are shifting the westbound lanes for construction staging, detours for the North West and South West ramp construction. I reviewed the tender for the construction of the interchange and identified the following construction staging as mentioned above for Years 2 and 3. Year 1: Year 2...