Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
GLOBAL | Apr 02, 2020
A Message to Our Readers
11K
0
News
GLOBAL | Apr 01, 2020
EarthCam Time-Lapse Documents Rafael Viñoly-Designed New Stanford Hospital Construction
43K
0
News
GLOBAL | Apr 01, 2020
Resort Town
6.5K
0
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
S
smallspy
replied to the thread
VIA Rail
.
On top of all that..... There is nothing installed between the axles on the lead trucks of the loco and cab car - certainly nothing...
Yesterday at 2:18 PM
S
smallspy
replied to the thread
Ontario Northland/Northern Ontario Transportation
.
They have not been certified for use by Transport Canada - they haven't even tested them yet. It is possible that Siemens has developed...
Tuesday at 10:05 PM
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
It is not clear as yet just what is going to change on these new trains. There may be a lot of carry-over from the TRs for all we know...
Tuesday at 9:57 PM
S
smallspy
replied to the thread
Finch West Line 6 LRT
.
Beyond all that.... The TTC also runs storm cars & trains when the weather is expected to be inclement. They do this done on all...
Monday at 2:54 PM
S
smallspy
replied to the thread
Alto - High Speed Rail (Toronto-Quebec City)
.
The obsession - if you think it is that - has to do with what is capable. Some members seem to think that using the particular track...
Sunday at 3:01 PM
S
smallspy
replied to the thread
Toronto
Toronto | Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis
.
Switch heaters, and trackside forces equipped with brooms. The same thing as the full-sized railways. Dan
Sunday at 2:49 PM
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
The trainshed is not an impediment to electrification of the tracks at Union Station, and never has been. Dan
Sunday at 2:40 PM
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
The H5s in particular went through a couple of courses of rather intensive work to keep them running reliably. The one that APTA-2048...
Sunday at 2:38 PM
S
smallspy
replied to the thread
VIA Rail
.
The plow was stuck at the time - the operator had exited the vehicle before the train was in sight. Dan
Friday at 2:01 PM
S
smallspy
replied to the thread
TTC: Other Items (catch all)
.
Why are you assuming that the TTC didn't rebuild any of their equipment? Dan
Friday at 1:53 PM
S
smallspy
replied to the thread
Alto - High Speed Rail (Toronto-Quebec City)
.
The trains that operate the actual tests where they are aiming for the highest speed possible - yes. That is correct. But part of those...
Friday at 1:52 PM
S
smallspy
replied to the thread
Alto - High Speed Rail (Toronto-Quebec City)
.
The French have seemed to have figured out the issue. Even in the test runs, where they ran many, many runs well in excess of 350km/h...
Jan 15, 2026
S
smallspy
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
There will be a switch added to the current north track immediately west of the current Danforth interlocking. In the long run, the...
Jan 15, 2026
S
smallspy
replied to the thread
Alto - High Speed Rail (Toronto-Quebec City)
.
The vast, vast majority of the French network is ballasted track, and they've tested it up to almost 575km/h. The LGV Est is operated...
Jan 15, 2026
S
smallspy
reacted to
Northern Light's post
in the thread
Alto - High Speed Rail (Toronto-Quebec City)
with
Like
.
I will post on the above docs in due course. For now though, I have to say......take anything Michael Schabas says with a very large...
Jan 14, 2026
Members
Back
Top