  1. U

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    Technically, there's an entrance/exit to the surface sandwiched between the Milton track and the new condo north of Crossways. Though the route is far from convenient, I believe this is the route most often used to connect between GO & TTC stations at the moment because the GO platforms are...
  2. U

    GO Transit: Construction Projects (Metrolinx, various)

    In the absence of proper accountability - for example detailed reporting to the Board meetings - it's all we have to go on.
  3. U

    GO Transit: Construction Projects (Metrolinx, various)

    This LinkedIn post confirms there's a team at Metrolinx planning the expansion of Milton line service. I know there are several frequent contributors who are anxious that they stop planning and start construction but at least we have confirmation that planning work (for example, preliminary...
  4. U

    Toronto Toronto | East Harbour GO & Ontario Line Station | 14.35m | 1s | Metrolinx | HDR

    No, it's an entrance off Eastern Ave to a corridor that'll take westwards into the main Line 3 station, which sits adjacent to the Broadview extension. To the left in this view there's also a small station area under the bridges for GO Trains, with the main Go station area also beside Broadview...
  5. U

    Alto - High Speed Rail (Toronto-Quebec City)

    Sign up for Alto's virtual information sessions or add a 4-hour in-person session to your calendar @ https://www.altotrain.ca/en/public-consultation Nothing posted yet for the Online consultation.
  6. U

    Toronto Toronto | East Harbour GO & Ontario Line Station | 14.35m | 1s | Metrolinx | HDR

    Does no one check these images before release? That's the Ontario Line in the foreground (with the shorter platform and platform doors) apparently now running Bi-level GO Transit stock!
  7. U

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Could it be that the Joint Corridor contractor is about to hand over the Riverside Station site to the Elevated Stations contractor?
  8. U

    GO Transit: Construction Projects (Metrolinx, various)

    Frustratingly, this yard is only needed once construction of the 3rd/4th track through Brampton is complete - to support Mt Pleasant 30-min services. Construction of the grade separation, west of this location, is the real priority project for the next incremental service upgrade - AD2W hourly...
  9. U

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Triggered review of Concrete for Engineers course materials (from 1982, so practice may have evolved!). Temperature of concrete should be kept above 0 C at all times The water and/or the course aggregate may be heated in the concrete batching process to prevent freezing during transport and at...
  10. U

    Toronto Toronto | Ontario Line 3 | ?m | ?s | Metrolinx

    Anyone know if the electricity system operator (ieso.ca) has de-energized the transmission circuits beside those cranes? If a crane failed or experienced unexpectedly high wind loads it could come into contact with a conductor - establishing a path to earth for ~140,000V. That would be fatal...
  11. U

    GO Transit: Construction Projects (Metrolinx, various)

    Metrolinx posted a Request for Qualification & Quote for Consultant Services for GO Expansion Track and Track Related Projects on Friday (19th Dec). The description includes: "In the delivery of multi-phased rail corridor service expansion programs, the Metrolinx Asset Management & Maintenance...
  12. U

    Roads: Ontario/GTA Highways Discussion

    But the Netherland's key strategy is getting people out of single-user vehicles. The modal share of private motor vehicles for the Amsterdam area was only 43% compared to Toronto CMA at 76%. In accordance with stereotype, it's cycling that contributes the most, with walking and public...
  13. U

    Roads: GTA West Corridor—Highway 413

    Yes, the original study area was big enough to cover a route from N Brampton to Guelph. But the "Halton Peel Boundary Area Transportation Study showed the need for an expressway between Mayfield Rd and the 401/407 junction and the GTA-West scope changed to take in that proposal. Those of...
  14. U

    GO Transit: Construction Projects (Metrolinx, various)

    The "Corridor Missions" presented at the last Metrolinx Board meeting suggest that the first incremental service upgrade will be 60-min All-day service to Kitchener. Which will require building the grade separated junction between Winston Churchill Blvd and the Credit Bridge (not at Silver...