  1. Z

    Kitchener Toronto | A.R Goudie Long-Term Care Home Expansion | ?m | 4s | peopleCare | srm Architects

    It's up to the mods on what they want to do with this but the addition to the existing building is what is completed. The second building fronting Frederick outlined in the site plan has yet to start construction.
  2. Z

    325 Allendale (Cambridge)

    This is the project I've mentioned in the IPort thread. Building A (315 Allendale) and B (325 Allendale) are completed (or awfully close) with Building C under construction. The developer for these 3 buildings is Fengate, in total it's just under 900,000 sqft of space between the 3 buildings...
  3. Z

    Cambridge Toronto | 255 King Street West | 61.6m | 16s | Auburn | Edge Architects

    The public side of the Cambridge permit system is a mess to try to decipher anything from. They have a foundation permit in place, the exact extent of what that particular permit covers in terms of buildings isn't clear, based on the foundation works Building A and Building B are the two that...
  4. Z

    200 Intermarket (Cambridge)

    I'm just going to loop a bunch of properties together since most of this area is all owned by the same developer and this just happens to be the one of the buildings under construction. If the mods want to break it into individual threads that's fine. Within the lands known as the East Side...
  5. Z

    Cambridge Toronto | iPort Cambridge Logistics & Industrial Campus | ?m | 1s | Triovest | Pearce Mccluskey Architects

    They aren't even close to leasing the first phase. The current leases are for Fuchs, ATS and Dare who collectively have about 325,000 sqft which is about 32% of the first phase. The developer behind this also has another project elsewhere in Cambridge that has over 200,000 sqft still to be...
  6. Z

    17 Vondrau (Cambridge)

    As YongeBloor mentioned this is a data centre. The site was originally owned by Blackberry but was sold to Ascent Corp. The site is really split into two different parts. There is the existing building at 17 Vondrau and then the vacant land (25 acres) behind the site which is intended for...
  7. Z

    Kitchener Toronto | SYLK Towers | 96.9m | 29s | Vive Development | R+L

    The intent for Vive on this site is to have the next building follow in succession, complete one then move to the next. Phase 3 doesn't have a decision in terms of the ZBA/OPA that was submitted for the extra height but that will be coming in the new year, at which point there will be some...
  8. Z

    Kitchener Toronto | 4220 King Street East | 64.99m | 18s | Tricar | Kasian

    The second tower is actively rising, they have all the appropriate permits to do so. The pictures I took from April that shows the podium is rather elusive in that the portion you could see from my second picture was just the podium along King, they hadn't done anything where the second tower is...
  9. Z

    88 Hickory Apartments (U/C Waterloo)

    This project is one of about a dozen projects that are awfully similar in the Northdale area of Waterloo, some are on Urban Toronto some aren't. For the vast majority of these projects they are midrise and have been utilizing precast, typically supplied by Stubbes. The primary target is students...
  10. Z

    West Oak Trail/Fischer Hallman (Kitchener)

    That would be for this project: https://urbantoronto.ca/forum/threads/toronto-249-west-oak-trail-m-8s-pinemount.41996/ The foundation and site servicing permit was issued on December 11th.
  11. Z

    Kitchener Toronto | Franklin Flats | ?m | 6s | Maxwell Building Consultants | ABA

    Yes the first 3 are complete, commercial units are occupied in the first two buildings which include a coffee shop, a barber shop, and a pharmacy, commercial for building 3 hasn't been leased yet. Then the building they're working on is the 4th and final building.
  12. Z

    180 King St. S., Waterloo

    There's already a thread for that one on Urban Toronto. https://urbantoronto.ca/forum/threads/toronto-allen-square-40-9m-10s-axia-geocapital-john-macdonald.36940/
  13. Z

    Kitchener Toronto | Elevate Condos | ?m | 15s | Pamata | ABA

    ELM intends to continue with the as approved plans. The permits for underground work for Towers B and C were issued and subsequently those levels were completed (why the crane was up awhile ago). Since then ELM has worked on getting the above grade permits for the next 2 buildings which have...
  14. Z

    Kitchener Toronto | The Metz | 127.8m | 38s | Auburn | Turner Fleischer

    The only work Auburn is doing is the first 3 buildings. They've been moving some of the piles of gravel around preparing for servicing of the internal roads but you can't really see that without a drone.
  15. Z

    Kitchener Station Park | 184.95m | 50s | VanMar Developments | Kirkor

    Building D is being marketed as Platform at Station Park. The original intent was for Tower C and D to go up together (hence Duo) but for obvious reasons that didn't happen. They have some building permits in progress for Tower D (foundation/tower) but nothing is being issued imminently...