Friday, July 26. Several changes in the perimeter areas of the site. North of Queen Street the original sidewalk up Spadina has been reopened under the protective hoarding. A 'permanent' construction access gate has been set up at the north edge of the site on Bulwer Street. Utility work was also being done on Friday, which closed both traffic lanes on northbound Spadina at Queen, with all northbound vehicles being diverted onto the streetcar tracks.

South side of Queen Street, new 'permanent' (duration of the project) access gates have been set up at the west edge of the site on Queen Street, and close to the Queen intersection on Spadina.

North Side:

20240726_122302.jpg


20240726_122207.jpg


20240726_122424.jpg


South Side:

20240726_122010.jpg




20240726_122802.jpg


20240726_122757.jpg


20240726_122910.jpg
 
September 3 - As noted by AnnetteMeetsJane above, it is very difficult to get a decent photo of the north site due to all the hoarding, and the actual excavation activities are taking place well set back from the entrance. Much excavation and truck movement is happening though.

On the south side, it looks like the site is still being prepared for the start of the major excavation activities. The main activity today appeared to be on the north retaining wall, with the ground around the wall being dug down, as seen in the photos below. Other than that, much of the previously on site equipment has now been removed.

20240903_131243.jpg


20240903_131252.jpg
 
Is it strange that they have built the concrete retaining wall in front of the gap in the perimeter that is supposed to be the gate which trucks use to exit the site? The section I am referring to is on Spadina, North (left) of the raised black construction office.
 