Friday, July 26. Several changes in the perimeter areas of the site. North of Queen Street the original sidewalk up Spadina has been reopened under the protective hoarding. A 'permanent' construction access gate has been set up at the north edge of the site on Bulwer Street. Utility work was also being done on Friday, which closed both traffic lanes on northbound Spadina at Queen, with all northbound vehicles being diverted onto the streetcar tracks.

South side of Queen Street, new 'permanent' (duration of the project) access gates have been set up at the west edge of the site on Queen Street, and close to the Queen intersection on Spadina.

North Side:

20240726_122302.jpg


20240726_122207.jpg


20240726_122424.jpg


South Side:

20240726_122010.jpg




20240726_122802.jpg


20240726_122757.jpg


20240726_122910.jpg
 