Part 3
Derry to the 401
More track work has taken place on the 401 overpass and need to get some shots of it as the bus shots not that great.
Courtney Park intersection was open as expected ahead of the Nov 4th date and no idea when it open. I need to check my photos for the intersection to see if the bullnose protection ror the crosswalk was built before the rebuilt or not as they are being built now.
I missed the building of Courtney Park station shelter as I only shot the intersection from the north side after getting of the bus and fail to noticed the work until I pass it on the southbound bus. Did not see anyone working on the shelter on Monday nor did I looked close at the station.
Decided to walked to the next bus stop as I had time to look at the raili area where the rails were removed between the two intersections. Removal of the rails are differnt between the 2 tracks location but a few 100' feet rof rail gone.
Signs up for the closure of Skyway intersection starting November 3rd to December 2nd. As I walked to Skyway, I notice a few small section of rail removed for track issue but what got me was the missing concrete to encase the rails for the northbound track for the future Skyway station as the southbound was encased. I cannot recalled if it was encased or not when I last walked the area in 2024 and will dig at a future date to see what I shot in 2024 or how I miss it. The temporary sidwalk for Skyway will not be ready for Monday intersection closure.
Since no bus insite and was only going to Derry on it in the first place, I continue walking to Derry and have a look at a few other location I have been planning on looking at.
A few more areas where rails have been remved for track issue. Got a close looked a the pad area south of Derry with no idea why it is there than for allowing X to turm with not curb cut to gain acess to it. The Northbound track has been rebuilt for track issues and waiting to be encase in concrete. Southbound was encased. The curbs have been rebuild with a cutout for a ramp. This is the only pad I have seen for the line so far and cannot think why it is there in the first place..
I made it to Derry just as the 17 was departing.
401
Pad area waiting concrete
Sidewalk not built for Monday closure
Future Skyway Station
You can see the shelter roof is in place/
Part 3
Derry to the 401
More track work has taken place on the 401 overpass and need to get some shots of it as the bus shots not that great.
Courtney Park intersection was open as expected ahead of the Nov 4th date and no idea when it open. I need to check my photos for the intersection to see if the bullnose protection ror the crosswalk was built before the rebuilt or not as they are being built now.
I missed the building of Courtney Park station shelter as I only shot the intersection from the north side after getting of the bus and fail to noticed the work until I pass it on the southbound bus. Did not see anyone working on the shelter on Monday nor did I looked close at the station.
Decided to walked to the next bus stop as I had time to look at the raili area where the rails were removed between the two intersections. Removal of the rails are differnt between the 2 tracks location but a few 100' feet rof rail gone.
Signs up for the closure of Skyway intersection starting November 3rd to December 2nd. As I walked to Skyway, I notice a few small section of rail removed for track issue but what got me was the missing concrete to encase the rails for the northbound track for the future Skyway station as the southbound was encased. I cannot recalled if it was encased or not when I last walked the area in 2024 and will dig at a future date to see what I shot in 2024 or how I miss it. The temporary sidwalk for Skyway will not be ready for Monday intersection closure.
Since no bus insite and was only going to Derry on it in the first place, I continue walking to Derry and have a look at a few other location I have been planning on looking at.
A few more areas where rails have been remved for track issue. Got a close looked a the pad area south of Derry with no idea why it is there than for allowing X to turm with not curb cut to gain acess to it. The Northbound track has been rebuilt for track issues and waiting to be encase in concrete. Southbound was encased. The curbs have been rebuild with a cutout for a ramp. This is the only pad I have seen for the line so far and cannot think why it is there in the first place..
I made it to Derry just as the 17 was departing.
401
Pad area waiting concrete
Sidewalk not built for Monday closure
Future Skyway Station
You can see the shelter roof is in place/