News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.6K     0 
Ok, brief open guessing game.

City estimates (subject to revision) for completion of basic plowing.

And...for snow bank removal.

On the former....date morning/afternoon/evening would be fine or total days.

For the latter, I will take days or weeks.
Basic plowing: Wednesday a.m. (all sidewalks included)

Snow banks: Feb 8
 
Seeing some of the photos of some of those Toronto neighbourhoods with on street parking, I don't even know how they will even be able to clean those streets.

Some of these idiots should have been periodically cleaning their cars I think.
 
Be sure to clear the HVAC heating and water heating exhaust vents of snow. Snow drifts could block the vents causing carbon monoxide buildup in your home at worst.

IMG_4748.jpg

You may want to clear the gas meter of snow as well.
 
Ok @PL1 and @innsertnamehere were both close'ish (based on current estimates)

The City projects completing plowing by late Tuesday or the wee hours of Wednesday.

****

On snow bank removal @PL1 has the field.......... best estimate 15-20 days from Wednesday evening. Current extended forecast - 14 days does not show any temps at or above zero
 
  • Like
Reactions: PL1
Ok @PL1 and @innsertnamehere were both close'ish (based on current estimates)

The City projects completing plowing by late Tuesday or the wee hours of Wednesday.

****

On snow bank removal @PL1 has the field.......... best estimate 15-20 days from Wednesday evening. Current extended forecast - 14 days does not show any temps at or above zero
In Montréal, they plow when there is 2.5 cm on snow on the ground. They remove the snow windrows as soon as there is 10 to 15 cm of snow on the ground. In Toronto, they wait till spring. All to "save money".
 
In Montréal, they plow when there is 2.5 cm on snow on the ground. They remove the snow windrows as soon as there is 10 to 15 cm of snow on the ground. In Toronto, they wait till spring. All to "save money".

The bold is absolute nonsense, completely and utter fiction you made up; it makes you look really bad. If you can't stick to the facts/truth, maybe stop posting.
 
On snow and how to manage it, Matt Elliot out with a column pushing an idea that reader here will have seen me stumping for.............snowmelt tech:


From the above:

1769451445391.png


* editorial note, not sure if it was Matt's mistake or The Star, but its not 'Hydroponic' its 'Hydronic'

He then goes on to note, rightly, that Toronto has the tech and infrastructure to do this now, in the form of Enwave. It would require add-ons under the sidewalks, but the energy source is there.
 
On an update from the Mayor and some sr staff, City Manager said snow removal will begin Wednesday. Also that they're doing things right now like punching holes into big snow banks so people can get on snow banks in the time before removal begins. City Manager says more areas are available for them to put the removed snow and they have new equipment, like snow melters, which the city didn't previously have/use, and in previous years they ran out of capacity which slowed down removal.

Mayor says snow removal will be faster in part because 311 will be accepting requests and there is better coordination between city and emergency services, and different city departments (ie newer equipment). Also highlights there is nothing in the contract from 2021 that requires the contractors to remove snow, so the city can't demand they just do it. Councillor Fletcher was asked if it was a mistake to sign the current contract and she says yes.
 
On an update from the Mayor and some sr staff, City Manager said snow removal will begin Wednesday

You heard it here first.

Ok @PL1 and @innsertnamehere were both close'ish (based on current estimates)

The City projects completing plowing by late Tuesday or the wee hours of Wednesday.

****

On snow bank removal @PL1 has the field.......... best estimate 15-20 days from Wednesday evening. Current extended forecast - 14 days does not show any temps at or above zero
 
  • Like
Reactions: PL1
On an update from the Mayor and some sr staff, City Manager said snow removal will begin Wednesday. Also that they're doing things right now like punching holes into big snow banks so people can get on snow banks in the time before removal begins. City Manager says more areas are available for them to put the removed snow and they have new equipment, like snow melters, which the city didn't previously have/use, and in previous years they ran out of capacity which slowed down removal.

Mayor says snow removal will be faster in part because 311 will be accepting requests and there is better coordination between city and emergency services, and different city departments (ie newer equipment). Also highlights there is nothing in the contract from 2021 that requires the contractors to remove snow, so the city can't demand they just do it. Councillor Fletcher was asked if it was a mistake to sign the current contract and she says yes.
Excellent summary.

Also in said press conference; once clearing operations have settled down, the city has to redeploy city staff to focus on snow removal since contractors arent obliged to remove (they only clear snow).
 

Back
Top