City: we need a highway that goes from two lanes to one lane.
Metrolinx:
Metrolinx:
Hasnt sanscon been doing well with the streetcar track replacements latelyDon't anyone hold you proverbial or literal breath.......but there is some sign of movement here. Mx has an RFQ out to pre-qualify bidders for construction of the Rail Path.
View attachment 712819
If they move at their usual molasses pace, the full tender could go out mid-spring, close early summer, be awarded just in time for snowfall '27....wasting an entire construction season. Of course, we will hope for unusual haste on their part.....and that Sanscon doesn't bid. LOL
Hasnt sanscon been doing well with the streetcar track replacements lately
Also any movement on that 200m budget they wanted for this?
Lakeshore/bathurst, king and church, king west and dufferin? all finished ahead of timeWhich ones? They were horrible on College Street.
See this post:
Cycling: West Toronto Railpath (City of Toronto, Phase II Proposed)
Got a notice that my request was marked as closed but I walked by today and the path is completely flooded with about a foot of water, so I will file a new request (or reopen the old one?) Maybe it's just melted from the sides of the path but they should put in some bumper reinforcements on...urbantoronto.ca
Lakeshore/bathurst, king and church, king west and dufferin? all finished ahead of time
I wouldnt even hire Sanscon to open the faucet from my kitchen sink, let alone make a sandwich.I haven't had a look at one and three. Church/King took longer than it needed to.....crews were undersized.
I didn't look over any of the three for deficiencies but that's a been a big problem with Sanscon. If you think its ok to do business with them, fine, please hire them....but keep them away from anything I care about.
I wouldn't put them in charge of making a ham and cheese sandwich.