News   GLOBAL  |  Apr 02, 2020
 8.8K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5K     0 

  1. Streety McCarface

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Perhaps transferring all the risk to the private sector, specifically the GC was always a stupid and impossible thing to do, especially when cost overruns are largely caused by things like unknown utilities and traffic control, things Metrolinx should have always taken the risk for.
  2. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Drilling will likely start next month, with excavation commencing within 2 months after.
  3. Streety McCarface

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Good, Metrolinx's argument was in bad faith anyway.
  4. Streety McCarface

    TTC: Other Items (catch all)

    People for some ungodly reason seem to forget that the crosstown will have more than 50 bus connections, connections to 3 (+1 in the future) subway lines, and 3 GO lines. The 34 and 32 aren't the entire story. They never have been and never will be.
  5. Streety McCarface

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    This has nothing to do with politicians, this has to do with Infrastructure Ontario & the MTO's funding and scheduling goals. It also has to do with the fact that the Milton section is being built with Asphalt over concrete, which, when considering MTO specs, is about 5* easier to construct...
  6. Streety McCarface

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    But its all-underground and with less than optimal ventilation.
  7. Streety McCarface

    GO Transit: Construction Projects (Metrolinx, various)

    I mean, the tunnel should still bring in some incremental improvements (ie weekend service), right?
  8. Streety McCarface

    Toronto Toronto | Ontario Line 3 | ?m | ?s

    As well as a changed landscape, significantly historic characteristics, and extra expropriation.
  9. Streety McCarface

    Hamilton Toronto | Hamilton Line B LRT | ?m | ?s | Metrolinx

    Environmental reviews and preliminary design takes a while, usually at least 2-4 years. With a pandemic and the government trying to cram 6 differet major (>5 billion dollar) projects in at once, I'm surprised they've moved as fast as they have.
  10. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Length is irrelevant, what is relevant is passenger capacity. Each Flexity can fit around 120 passengers before dwell times are affected (See the streetcar network) Each 40' bus can fit around 40 passengers before dwell times are affected. With 2 LRVs travelling down eglinton every 3 minutes...
  11. Streety McCarface

    GO Transit Electrification | Metrolinx

    We've been saying this for years though, 15 mins would be the absolute minimum...
  12. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Even if the second crew change isn't at Kennedy, you're going to have to have one somewhere. A trip to Kennedy from Mt Dennis will take at least 50 minutes, probably an hour (we don't know how traffic control will affect travel times, or how much the TTC will pad the schedules). From there to...
  13. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    I have been saying that Eglinton (pre covid) would be over-capacity from day one, and that was with running 3-car trains. East of Don Mills? No, but west of Yonge, absolutely. Running 2-car LRVs increases the capacity crunch even further. The ideal solution for Eglinton would have been a...
  14. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Speed in this case is dictated by the corridor and stop spacing, which are windier and much greater on the RT corridor respectively. It also relies on human inputs, which have a delay associated with them (see reaction factors in traffic equations). The latter are generally negligible, but they...
  15. Streety McCarface

    VIA Rail

    Passenger derailments make national news here though too, it's freight derailments that result in no injuries that don't. Not good, but when the consequences are significant, the response generally is.
  16. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Building LFLRT on Eglinton Ave and Don Mills should not be deemed "sensible" by any measures. Also, converting a high-floor rapid transit service to a low-floor one, while it has its benefits, is not "sensible" either tbh.
  17. Streety McCarface

    Danforth Line 2 Scarborough Subway Extension

    Imagine thinking this poll isn't biased based on its target audience, the phrasing of questions/answers, the lack of an option for LIM, the lack of representation by the individuals that would actually use the service, and the fact that the sample size is far too small to have any sort of merit...
  18. Streety McCarface

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    I did for half a year, along with at least 100 other people that left through the north access road, and another 150-200 that left through the south access road. With a new Menkes development opening up just across the 407, I can guarantee a bunch more people will too.
  19. Streety McCarface

    GO Transit: Service thread (including extensions)

    This is pretty standard in Canada and the US, and yes, that's exactly what they're fearful of. Lawsuits for god knows what are very common here, so if some dumbass decides to drive into a tower, and something bad happens (Falling infrastructure, damage to a tower, or even just the driver...