News   GLOBAL  |  Apr 02, 2020
 8.9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. E

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I wonder what headways they were running on the Yonge line for the New Years rush. This is one of those times that if there were frequent GO services I have to believe this crowd would have been dissipated more easily. Right now there is only one frequent service out of Union which clearly...
  2. E

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    If that is true, that is a crazy interaction model. Metrolinx needs to leave pristine intersections for the city to dig up all the streets in between the intersections? Surely they could demarcate areas of responsibility so that Eglinton doesn't need to be dug up for 15 years straight.
  3. E

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    Yes, that would be a city project... like Eglinton Line = province, and Eglinton Connects = city. The provincial part will get built, the councillors will complain about how the province mismanaged the project because the project is so late and over budget, and despite the elapsed time the city...
  4. E

    GO Transit Fleet Equipment and other

    That is the ONxpress contract. What GO does before the ONxpress contract delivers its electrification and signalling improvements would no doubt be extending the life of what it is doing now with marginal improvements at best. The current plan doesn't complete until 2032. That means that...
  5. E

    GO Transit Fleet Equipment and other

    What unique conditions exist here that would affect the right choice for rail vehicle other than the service we are starting with which is "low frequency rush hour commuter service" which is exactly what this project is meant to get away from? A choice of locomotive pulled bi-levels leads to...
  6. E

    GO Transit Fleet Equipment and other

    I'm not sure how long it will take until we see them, but I'm pretty sure we will. I don't think 14 billion dollars is going to be spent just to run a few more GO bi-level trains per hour. Metrolinx could easily have continued its double tracking and station construction works without this...
  7. E

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    All the way from Jefferson to Atlantic :)
  8. E

    Toronto Toronto | St Clair-Old Weston GO Station | 9.13m | 1s | City of Toronto | Hatch

    I'm curious how they would describe the primary user base for this station. The design focus seems to be Union Street and bus connections, but my gut says the demand is St.Clair (Stockyards and streetcar). Knowing they are going to build a new St.Clair underpass and Davenport overpass, it...
  9. E

    Toronto Toronto | Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    Those Sublevel 2 concourses look optimized for side platforms on Line 1, the walls they put in at the south end of the Line 1 when they shifted the platform north look temporary, and the escalator from the existing concourse to Y&E never was optimal and with the redevelopment will seem out of...
  10. E

    Toronto Toronto | King-Liberty GO Station | 21.39m | 3s | Metrolinx | WSP

    It seems that the goal of the stations entrances were to maximize the service area of the station (to make it closer to more customers) and not to maximize neighbourhood connectivity. The one entrance provides an excellent connection to Liberty Village and Atlantic @ King, the other entrance...
  11. E

    Yonge-Dundas Square/Sankofa Square (Brown + Storey Architects)

    For all the things you would think that you would have a public outreach on, you would think the renaming of landmarks and major streets would be one of them. There is a policy on renaming streets requiring 75% because there are real costs to businesses updating website, signs, business cards...
  12. E

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    Being able to move people across the tracks more effectively and ensuring access between Liberty Village, CNE Site / BMO Field, and the GO station is maintained throughout the construction of the Ontario line and the massive station that will be built here.
  13. E

    Metrolinx: Other Items (catch all)

    You haven't seem comically undersized bus passageways until you have been on a bus pulling into the Avenida de América bus terminal in Madrid. The buses goes through thin passages, tight turns, and not much in the way of emergency escapes are seen. Buses can barely pass parked buses, and the...
  14. E

    Metrolinx: Other Items (catch all)

    The current design has 18 bus platforms all in the unpaid area. Looks like 4 could handle articulated buses.
  15. E

    Roads: Ambassador & Gordie Howe Bridges

    I don't think that will work in the Ambassador Bridge's favour. The Gordie Howe Bridge will have 36 US inspection lanes (21 non-commercial / cars, and 15 commercial / trucks). They will adjust staffing to optimize throughput on the main crossing.
  16. E

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    The Salvation Army building isn't going to have a connection to the station. It is sitting on top of and in front of the mechanical and vents built for Line 5, but there are no vents, doors, or anything else connecting the two. At the end of the project there is a building entirely owned by...
  17. E

    Toronto Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Unfortunately there currently doesn't seem to be a plan to make the Eglinton subway station more whole. Even the 2180 Yonge plans show a small entrance building on the corner for some reason.
  18. E

    SmartTrack (Proposed)

    It is the name of the initiative that led to these stations getting funded and prioritized. It was a strategy to put urban rail / metro into an existing rail corridor plus vacant space along Eglinton West, and evolved into agreements between the city and the province to achieve similar...
  19. E

    GO Transit: Construction Projects (Metrolinx, various)

    Depending on what Google Maps tells me I decide if the trip by transit is reasonable or not. When the trip is only slightly better or the same, you are right, it would be just the same number of riders shifting patterns. However, when it is significantly better than the previously existing...
  20. E

    Toronto Toronto | 685 Lake Shore East | 129.51m | 35s | Carlyle Communities | BDP Quadrangle

    On the north side of the same Lake Shore and Broadview corner the allowed height is 190m according to the by-laws for the East Harbour / Unilever site. Seems like a transit oriented location. I can see having zero affordable units being an issue especially with that being the focus where...

Back
Top