    Lack of meaningful Passenger Rail service outside the Quebec-Windsor Corridor

    I mean, it’s very like Ireland other than only one level of government there (national) controls transit planning and funding - this is absolutely not a compliment
  2. dowlingm

    Lack of meaningful Passenger Rail service outside the Quebec-Windsor Corridor

    The problem with this forum in general but transportation threads specifically is they attempt to bring rational analysis to services and projects which simply can’t be analyzed rationally, because they all have a political foundation. Take reinstatement of Northlander. The Tories never...
  3. dowlingm

    Lack of meaningful Passenger Rail service outside the Quebec-Windsor Corridor

    This is just posting for attention at this point.
  4. dowlingm

    VIA Rail

    A development app or something else where some of the drawings would be posted is what I had in mind
  5. dowlingm

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    That sounds like the north end exit to the Northbound platform at Davisville. Not saying it’s a reason to do it a second time, just saying there’s a precedent.
  6. dowlingm

    Toronto Toronto | Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    If anything, hasn’t Pearson been seen as a cash cow for the Feds?
  7. dowlingm

    TTC: Other Items (catch all)

    Route 88, already diverted via Davisville thanks to the mess on Moore Avenue at Mud Creek, is now split east of Bayview. Until July 14, instead of both branches converging westbound at Millwood/Sutherland: the A branch will continue along Southvale/Moore from Millwood where it ordinarily turns...
  8. dowlingm

    Lack of meaningful Passenger Rail service outside the Quebec-Windsor Corridor

    If something of that sort was contemplated by Parliament as a current activity, it would be found within an unrepealed statute such as the CN Commercialization Act (S.C. 1995, c. 24). For example, Parliament wanted CN to be unambiguously subject to the Official Languages Act, and a direction to...
  9. dowlingm

    Lack of meaningful Passenger Rail service outside the Quebec-Windsor Corridor

    I would argue that if we are looking to “where could Canada have taken another path” it would have been when CN was privatized as a combined service operating company and infrastructure manager. Instead the track was left with CN as their asset, with all the consequences that flow from that. It...
  10. dowlingm

    Broadview Eastern Flood protection and area

    Having squinted at the source PDF I see your point Dan. Maybe the difficulty here is that WT is only being asked for approval to conduct works for an initial phase, with ramp reinstatement / replacement in a later one. I think it would have been helpful for that to have been explicitly set out...
  11. dowlingm

    Broadview Eastern Flood protection and area

    okay… what are we elevating? The ramp? The development? Can’t elevate the DVP itself.
  12. dowlingm

    Broadview Eastern Flood protection and area

    If the ramp is there, the land can’t be flood proofed. What do you suggest be done?
  13. dowlingm

    Lack of meaningful Passenger Rail service outside the Quebec-Windsor Corridor

    As was pointed out up thread, since VIA does not print its own money, the issue is more that their funder does not want costs to increase. Were the Quebec Assembly to open their wallet, who know what might be afforded.
  14. dowlingm

    Broadview Eastern Flood protection and area

    Since it seems to be a prerequisite to Unilever lands and to the Ontario Line, seems to be harder for govts to duck funding this own…
  15. dowlingm

    Eastern Avenue Bridge/DVP Interchange

    Is this the same ramp slated to be removed under the Eastern / Broadview flood protection scheme?
  16. dowlingm

    VIA Rail

    Did VIA have to put in an application, or are they somehow exempt due to being on rail lands or being federally owned?
  17. dowlingm

    Lack of meaningful Passenger Rail service outside the Quebec-Windsor Corridor

    I have often wondered about redirecting these trains to terminate in Quebec City, but aside from the mostly discontinued rail alignments in that region, such as the St Raymond Subdivision which was turned over to a biking trail causing a circuitous route (and thus reducing the saving of time or...
  18. dowlingm

    Montréal Transit Developments

    I mean, the Port of Montreal surely has something to do with the fact that service from the east routes over the top of the City?
  19. dowlingm

    Ontario Northland/Northern Ontario Transportation

    I wonder if CN would prefer the revived Northlander station to be on the Newmarket Sub where Simcoe 169 turns north, after the switch west of the VIA station, so as not to hold up the Bala Sub mainline. Per OpenRailwayMap, it looks like one point the track switch was south of the VIA station...