News   GLOBAL  |  Apr 02, 2020
 8.9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. FNTS

    Roads: Gardiner Expressway

    It looks pretty accurate to me (minus the fancy buildings not yet built):
  2. FNTS

    Roads: Gardiner Expressway

    Ha, beat me to it.
  3. FNTS

    Roads: Gardiner Expressway

    One impediment at a time, let's start with the one that's a safety hazard and bleeds money first. Besides the underpasses under the railway tracks can be easily and cheaply be spruced up.
  4. FNTS

    Roads: Gardiner Expressway

    Presentation from Waterfront Toronto press conference is online: http://www.gardinereast.ca/sites/default/files//media/TRN02%20-%20presentation%20-%20MEDIA%20-%202014%2002%2005_1.pdf A few new artist's impressions for the "Remove" option: At Sherbourne, day: At Sherbourne, night...
  5. FNTS

    Roads: Gardiner Expressway

    That was meant to be funny. Humour, you know?
  6. FNTS

    Roads: Gardiner Expressway

    How is the walk longer if the width of the corridor is still the same? The two extra car lanes will be carved out of the big median currently in place to sustain the pillars and the on and off ramps, which you still have to cross today.
  7. FNTS

    Roads: Gardiner Expressway

    Even if it just looks like this (another option being studied) it will be a huge improvement from what currently exists:
  8. FNTS

    Roads: Gardiner Expressway

    Actually, yes:
  9. FNTS

    Roads: Gardiner Expressway

    Well, you actually DO improve the city by punishing drivers, that's what congestion charges do, for instance. And how does tearing down the Gardiner impede building better transit alternatives? Construction of the DRL is still a priority. There's even the possibility of adding transit to the new...
  10. FNTS

    Roads: Gardiner Expressway

    Dang, you caught me. It wasn't easy either with all the climbing gear I had to bring to climb on top of it first ;)
  11. FNTS

    Roads: Gardiner Expressway

    It's not only a transportation decision, it's a city-building decision as well. It's also an economic decision, patching up the Gardiner every once in a while to make it safe for cars and pedestrians is more expensive than tearing it down in the long run, on top of potential revenue lost from...
  12. FNTS

    Toronto Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    This won't be very good branding either: Original photo credit: Secondarywaltz, from the Union Station Wikipedia page
  13. FNTS

    Roads: Gardiner Expressway

    Car experience probably won't be improved, but for some of us that's a good thing if we're trying to disincentive the use of the car. Pedestrian experience won't be improved? are you kidding me? I used to live two blocks from the Gardiner and had to cross it everyday on foot, and trust me...
  14. FNTS

    Roads: Gardiner Expressway

    You're right, they only presented the Preliminary Evaluation Results Matrix. http://www.gardinereast.ca/sites/default/files//media/Preliminary%20Evaluation%20Results%20Matrix_0.pdf
  15. FNTS

    Roads: Gardiner Expressway

    Waterfront Toronto has released the report: http://www.waterfrontoronto.ca/1999/11/draft___gardiner
  16. FNTS

    Toronto Toronto | Forma | 308m | 84s | Great Gulf | Gehry Partners

    An article about last night's Star Talk between David Mirvish and Christopher Hume yesterday at the Reference Library http://toronto.curbed.com/archives/2014/02/05/will-frank-gehry-perform-a-facadectomy-to-save-king-st-project.php I was there last night, and I have to say Mirvish seems really...
  17. FNTS

    Roads: Gardiner Expressway

    If Lakeshore was a beautiful avenue like University (I know Jane Jacobs hated it, but still), I wouldn't mind crossing it at all. It's the ugly concrete, the deafening sound, the feeling you're not welcome that the Gardiner creates that's a barrier. Even going under the railway tracks can be...
  18. FNTS

    Toronto Toronto | Pan Am Village in the West Don Lands | ?m | ?s | DundeeKilmer | KPMB

    Permit issued for restoration work on the Canary Restaurant building: http://app.toronto.ca/ApplicationStatus/details.do?folderRsn=3482263 Application: Building Additions/Alterations Status: Permit Issued Location: 409 FRONT ST E TORONTO M5A 1G9 Ward 28: Toronto Centre-Rosedale...
  19. FNTS

    Still cookin' at the Canary

    Restoration work will begin on this building: http://app.toronto.ca/ApplicationStatus/details.do?folderRsn=3482263 Application: Building Additions/Alterations Status: Permit Issued Location: 409 FRONT ST E TORONTO M5A 1G9 Ward 28: Toronto Centre-Rosedale Application#: 13...

Back
Top