  1. Jeff Morgan

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Picture taken from the 30th floor of Pier 27 Tower on Monday
  2. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    I was only in the north west corner unit on the 30th floor. I do have another picture of outside and a nice video. This site doesn't allow videos to be uploaded but here is the other picture looking down at yonge slip. Mostly took pictures of the inside of the unit.
  3. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    I was fortunate enough to visit the 30th floor of the building. Here are a couple of pictures I took from a 30th floor balcony looking out at the city and lake.
  4. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    Can you share the reference to the original document? Thanks!
  5. Jeff Morgan

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Is it too late for the city to decide to do something different?
  6. Jeff Morgan

    Cycling infrastructure (Separated bike lanes)

    The article mentioned that they were looking for projects that would help transition to a clean economy so I thought this would be very appropriate.
  7. Jeff Morgan

    Cycling infrastructure (Separated bike lanes)

    https://www.theglobeandmail.com/politics/article-mckenna-seeking-shovel-ready-projects-for-post-shutdown-stimulus/ How much would it take to accelerate the bike lane plans for Toronto?
  8. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    https://www.theglobeandmail.com/politics/article-mckenna-seeking-shovel-ready-projects-for-post-shutdown-stimulus/ I'm fairly certain this project is not even close the shovels ready :'(
  9. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Thank you for the picture. I miss working two blocks from this building and being able to walk down to see the progress during lunch.
  10. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    I was able to walk by today and and speak to the security manager for the building. He told me that there is a focus on cleaning up the grounds and that the first tenants will move in starting March 17th. He also said that landscaping (both hard and soft) will begin next week for the extended...
  11. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    Is three years what one would typically expect to complete the design work to 30% complete?
  12. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Walked by today. Looks like they are watering the lawn ;) External construction elevator is starting to come down today. I'll try to get more pictures of it later in the week.
  13. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Hoist removal scheduled https://pier27construction.info/2020/02/05/pier-27-construction-midweek-update-february-5-2020/
  14. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    Studying the feasibility of alternative portal location makes a lot of sense. Does anybody know what phasing options might be considered? Is there any related materials?
  15. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Sunday morning picture from the CN tower
  16. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    @drum118 do you know when the portal study is expected to complete?
  17. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    I am totally confused on where everything sits. When is the design work expected to complete? Will the design work recommend a preferred option for the portal and loop?
  18. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    There was nothing mentioned about the final phase. I think I read someplace that the remaining land was for sale and the new owner would be responsible for the buildings.
  19. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Does the park have a name? I'm having difficulty finding any information about .
  20. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    It was an estimate. But it was stated that Waterfront Toronto does not have it on the five year plan and the typical planning cycle is seven years.