  1. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Tuesday through Thursday there was a lot of concrete being lifted to the top. Friday I didn't see any. They may have finished the concrete work. Can see this site from my work. Taken June 18th
  2. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    There has been a lot of concrete poured over the past two days. Hopefully they are about to top out.
  3. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    It will go away when the parking lot goes.
  4. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    I thought I read that this was cancelled and the owner wanted to sell the property to another developer.
  5. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Have the details for the new tower been released?
  6. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Here it is today from a different angle.
  7. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    We are at 33 out of 35 floors. Won't be long until they top out. I hope they speed up the installation of the deck railing as it really enhances the look of the staggered design.
  8. Jeff Morgan

    Mississauga Toronto | Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    I live in Mississauga not far from that intersection and I've never heard it referred to by that name.
  9. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    A couple of shots from Tuesday.
  10. Jeff Morgan

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Here is what they will do to the star building.
  11. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    The people mover is one of the two options being considered. The second is to make the changes necessary to the existing streetcar tunnel to allow for the increased traffic / volume. The two options go before the City in April to make their selection/decision.
  12. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    Looks like there is one at Freeland and QQE in the drawings.
  13. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    I have a question. The last few pages of the presentation depict options for a portal location. What exactly is this?
  14. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    Taken Wednesday. 30 out of 35 floors poured.
  15. Jeff Morgan

    Road Safety & Vision Zero Plan

    Not sure if this is old news but... https://www.treehugger.com/cars/average-age-toronto-pedestrians-killed-drivers-year-652-why.html
  16. Jeff Morgan

    Waterfront Transit Reset Phase 1 Study

    So many good ideas posted here to deliver the QQE faster for less money. Are any of these options even being considered by the city?
  17. Jeff Morgan

    Toronto Toronto | Tower at Pier 27 | 114.9m | 35s | Cityzen | a—A

    I know it is a long way from occupation, but seeing the first floor glass brings up the question about tenets. Anybody know who might occupy that space?