News   GLOBAL  |  Apr 02, 2020
 8.9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. Bibi L

    Toronto Toronto | Monde | 149.95m | 44s | Great Gulf | Moshe Safdie

    Found these photos I took from October 2022.
  2. Bibi L

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    I’ve seen that post. That was not terrible. Everybody has to start somewhere. It seems we all first visited this site years before our first posts. lol. Edit: Here is a photo of the “fire” atop L Tower. Created by the aircraft warning lights and boiler plumes.
  3. Bibi L

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Haha, I’ve been watching this website for years. Recently I decided to make an account and upload pictures.
  4. Bibi L

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    I created a GIF time-lapse of Pinnacle SkyTower with photos taken once every month from April 2022 to May 2024. Today, May 31, another floor seems to have been added. 27 floors now?
  5. Bibi L

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    May 26. More progress on the glass cladding. Glass, glass, glass! That is a lot of glass-clad high-rises.
  6. Bibi L

    Toronto Toronto | Aqualuna at Bayside | 61.87m | 18s | Tridel | 3XN

    May 25 & 26. This is looking really nice. Peaking its little 62 meter head. Surrounding buildings.
  7. Bibi L

    Toronto Toronto | St Lawrence Market North | 25.3m | 5s | City of Toronto | Rogers Stirk Harbour

    May 26. Old meets new. Taken from the St. Lawrence Market. And another from a familiar viewpoint.
  8. Bibi L

    GO Transit Fleet Equipment and other

    Just to become a GO Train operator you need six years of training. From CityNews: "Seems simple but it's not, becoming a GO train operator takes about six years of training. (Metrolinx): We hire everyone on as a customer service ambassador, the training for that's about six to eight weeks long...
  9. Bibi L

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Thank you. And yes, “bro” is correct.
  10. Bibi L

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    May 12 More glass Is that a ramp to an underground parking lot? Alleyway Phase 1
  11. Bibi L

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    May 12 What floor count are we at, 25? Some close-ups:
  12. Bibi L

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    They have put green scaffolding around the heritage building. It looks like they are only renovating the exterior.
  13. Bibi L

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    May 5, 2024 The SkyTower is starting to get close to 100 meters. For reference, the Toronto Star building is 101 meters to the top, and where I am taking the pictures is 108 meters to the top, but 99 meters to the top floor.
  14. Bibi L

    Toronto Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    May 5, 2024 From the ground, Yonge and Esplanade. Taken 33 Floors Up. CN Tower is getting blocked more and more… Through the Window. 31st floor terrace. It’s starting to peak through.
  15. Bibi L

    GO Transit Fleet Equipment and other

    The old coaches have 1 condensing unit on each side, so in total 2. The new ones appear to have 2 on each side, 4 in total. Maybe the older cab cars had to share the HVAC system with the rest of the car since there were only 2, while the newer ones can have their own separate A/C because they...
  16. Bibi L

    Toronto Toronto | Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

    Process of installing a window: Windows waiting to be installed. Window being lifted. Almost done Installed. Some windows have been re-installed on the 7th floor correctly. Still have to fix some windows on the 8th floor. Current progress of the whole tower.

Back
Top