News   GLOBAL  |  Apr 02, 2020
 8.9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Are you accounting for delays? The plan is 3 years, but also they're looking into switching to 24/7 work to get it done quicker. Whether that actually happens is another story.
  2. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Updates from today: On a related note, the stretch of Manitoba drive North of the Food Building was being paved today. After that area reopens, it will be possible to get closer to work going on under the Gardiner. Thankfully a high megapixel camera allows me to crop in considerably in the mean...
  3. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    May 1st update. Eastbound lanes have been shifted into middle section. Yeah, it's definitely on hold, I would say until at least after the Gardiner rehab is done since they need access underneath (where the extension will run) and the north end of the parking lot next to Centennial Park is...
  4. kotsy

    Toronto Toronto | 150 Dunn | 12.74m | 4s | City of Toronto | Montgomery Sisam

    I don't but would be happy to pop over there today 😊
  5. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Thanks for sharing! Glad to hear it 😁 April 30th update. Lane painting down the closed middle section has almost reached Dufferin. I expect eastbound traffic to be shifted here in the next couple days. And rehab work has started on a few different bents East of Exhibition GO.
  6. kotsy

    Toronto Toronto | 1375 Queen West | 30.6m | 8s | Skale | Giannone Petricone

    Girlfriend snapped a pic of heavy equipment on site.
  7. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    I think what will happen is the east or westbound traffic will be moved into the middle section and actual work will commence on the vacated lanes.
  8. kotsy

    Cycling infrastructure (Separated bike lanes)

    The bike (gutter) lanes on Gladstone have finally been painted in.
  9. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    April 29th update - asphalt laid. Also, the land under where the CNE kids buildings were at the top of Centennial Park has been dug up. I'm assuming it's got to do with Gardiner work but I could be wrong with that.
  10. kotsy

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    We still haven't heard anything about what height they are building to. Changed my timeline after realizing I based it off the size of the building in the comparison graphics, which is much shorter than the actual plans.
  11. kotsy

    Toronto Toronto | The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

    Looks like it's about a year until top out if they keep at current pace and it's built to the highest approved height.
  12. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    It's above the closest dirt pile on the right side. This one blends in even more thanks to the drop in resolution during the upload.
  13. kotsy

    Toronto Toronto | Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

    Where do you see that it's half the width? I've seen through the door and it looks to be the same as the current section open now. Either way, the point of the pedestrian bridge, which is open any day/week now, is to relieve overcrowding in the tunnel. My update from the weekend: Got a big ol'...
  14. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Concrete has dried and sewers/drainage installed for what will be car lanes when traffic is shifted. Also included a shot under the Gardiner looking East from Ex GO. No extra supports yet but I would assume on the way soon.
  15. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Don't think so. According to this they're be rehabilitated...
  16. kotsy

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    Additional supports have been added from Exhibition GO heading westward. Looks like a 2nd support will be added to each section soon.

Back
Top