News   GLOBAL  |  Apr 02, 2020
 9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.1K     0 

  1. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    The future of Downtown Toronto (feat. The Ontario Line) by @FutureModelTO
  2. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    A closer look at development activity along the southern end of Downtown Toronto, toward the Entertainment District and Central Waterfront: by @FutureModelTO
  3. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    North buildings are 29 storey. I believe they are pouring 18th floor now.
  4. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    L1 and L2 are retail spaces, and residential units begin on the third floor. The major amenities are located on the 11th floor (the level with parapet walls). They are currently working on the 16th (construction) or 17th (municipal/marketing) floors.
  5. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    I'm not sure but I think they are doing re and re.
  6. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    I believe the window and metal panel systems are in good working order and will not cause any problems for the condo or its owners in the future. The contractor is working on the building elevations to fix oil canning, gaps between panels, and other details, as far as I can tell.
  7. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Has anyone recently looked at the south elevations (facing The Esplanade)? I believe they're repairing all of the metal panels.
  8. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    The trades of formwork, crane/hoist, drywall, and tile are on strike.
  9. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    There is a one-level underground parking garage for residents and visitors. There are also residential parking spaces on levels 2 through 10.
  10. G

    Toronto Toronto | Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Strike involving 15K construction workers could impact residential builds in the GTA: union

Back
Top