News   GLOBAL  |  Apr 02, 2020
 9K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.2K     0 

  1. A

    Toronto Toronto | Union Centre | 298m | 54s | Westbank | Bjarke Ingels Group

    @insertnamehere - You are correct. Turns out the Table 8 Population line data is 15+ only, not the total number of individuals in the CMA. I called Statistics Canada, and was walked through to the source table for the data. The difference between the Population lines versus the Labour Force...
  2. A

    Toronto Toronto | Union Centre | 298m | 54s | Westbank | Bjarke Ingels Group

    Folks - please be careful with the Statistics Canada data, and look at the qualifying information. In some of the labour force data, the numbers are for ages 15 and over (for example Table 7 in the monthly LFS) while other data can (Table 8 for example) includes total population, the labour...
  3. A

    Toronto Toronto | Union Centre | 298m | 54s | Westbank | Bjarke Ingels Group

    The detailed Labour Force statistics are reported monthly in the regular Statistics Canada release The Daily, issued Monday to Friday at 8:30 AM (except Government of Canada holidays): https://www150.statcan.gc.ca/n1/dai-quo/index-eng.htm The Daily usually contains a number of releases. On...
  4. A

    Toronto Toronto | Union Centre | 298m | 54s | Westbank | Bjarke Ingels Group

    Statistics Canada Labour Force Survey report for March 2024, published on April 5. Details for Montreal, Toronto and Vancouver specifically for the month of March are contained in Table 8. The data for other cities in Canada at a more summary, three month moving average basis is contained in...
  5. A

    Toronto Toronto | Union Centre | 298m | 54s | Westbank | Bjarke Ingels Group

    THE REAL: Judging by all the recent high vacancy in the core, i doubt any more office towers will be built after the second phase of CIBC square. Some thoughts on the longer term perspective. But first a brief comment on the present state. The past couple of years have seen a large amount...
  6. A

    Streetcar Tracks on Adelaide

    My apologies, I believe I may have created some confusion here. The one photo showing two sets of tracks was of the section of York Street where the new southbound tracks, still incomplete, are being added. Adelaide has only one set, eastbound, of tracks, now continuous (except for the...
  7. A

    Toronto Toronto | Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    April 19 - In the evening sunshine:
  8. A

    Toronto Toronto | KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    April 19 - King Toronto in the Friday afternoon sunshine:
  9. A

    Toronto Toronto | Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

    From yesterday, April 18. Work on the rooftop terraces and on the Front Street sidewalk areas. The sidewalk work has been going on for quite a time - will be much better for the Front Street pedestrian traffic when completed. Starting with an overview photo of the full site. Hopefully the...
  10. A

    Toronto Toronto | KING Toronto | 57.6m | 16s | Westbank | Bjarke Ingels Group

    April 19: Photos of the West Mountain from this morning. View from the Wellington Street side from yesterday, during a brief moment of afternoon sunshine.
  11. A

    Streetcar Tracks on Adelaide

    From yesterday, April 18. More work on the streetcar tracks between York and Bay Streets. Also at the end, a photo of some partially installed overhead cabling.
  12. A

    Toronto Toronto House | 186.53m | 58s | Allied | Hariri Pontarini

    From April 18: Working on the Adelaide sidewalk on the eastern portion of the site:
  13. A

    Toronto Toronto | Natasha Residences | 156.9m | 47s | Lanterra | BDP Quadrangle

    April 18 - Making Progress, but in reverse. The demolition equipment that had been on site is now gone. From Front and Back:
  14. A

    Toronto Toronto | Theatre District Residence & Riu Plaza Hotel | 156.05m | 49s | Plaza | BDP Quadrangle

    From April 18 - The construction crane is still coming down. Compared to the times taken by other sites to bring down their construction cranes, this one seems to be quite slow. Meanwhile, the landscaping preparation for the areas in front of the townhouse units is underway. boulevard area in...
  15. A

    Toronto Toronto | Central Condos | 138.98m | 46s | Concord Adex | DIALOG

    From yesterday, April 18. Final base building finishing up stages. Tower exterior and the sidewalk restoration appear to be fully complete. On the exterior, just some minor work on the podium appears to be remaining.
  16. A

    Toronto Toronto | QRC West Phase 2 (Queen Richmond Centre West) | 35.96m | 7s | Allied | Sweeny &Co

    From April 18 - Base building looks complete, including sidewalk restoration work. Now waiting on tenant fit-ups to start.
  17. A

    Toronto Toronto | 369 Queen Street West | ?m | 3s

    April 18: Construction is continuing, but slowly.
  18. A

    Toronto Toronto | 123 Portland | 49.3m | 14s | Minto Group | Sweeny &Co

    From yesterday, April 18 - The base building of 123 Portland is very close to being finished. When the builder gets around to the post-construction cleaning of the exterior windows would be a good clue.

Back
Top