News   GLOBAL  |  Apr 02, 2020
 9.2K     0 
News   GLOBAL  |  Apr 01, 2020
 40K     0 
News   GLOBAL  |  Apr 01, 2020
 5.3K     0 

  1. P

    Toronto Toronto | One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    wow! Are you in need of a psychiatric assessment? Cause it sure looks that way. I am not anti-condo, nor I was complaining. I was just stating how impressed I am with the speed of the construction. You really need some help.
  2. P

    Toronto Toronto | One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    this has to be the fastest rising highrise project in GTA.
  3. P

    Toronto Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    If you are talking about post-2050 preliminary plans, then yes. However, that would also require reconfiguration of most, if not all, 409/427 ramps... However, there are no immediate plans (ie, nothing in the next 30 years) to expand T1 beyond Pier H and I as shown here...
  4. P

    Toronto Toronto | Five St Joseph | 160.93m | 48s | Five St. Joseph | Hariri Pontarini

    Sure... Let's just leave it at that, and get back to discussing the Five. The bottom line, Yonge St houses will undergo a major structural transformation that would take time to accomplish. Hence, there is no way for retail to open any time soon.
  5. P

    Toronto Toronto | Five St Joseph | 160.93m | 48s | Five St. Joseph | Hariri Pontarini

    Here: http://urbantoronto.ca/news/2012/10/interview-era-architects-heritage-five-st-joseph In this interview posted back in October, the developer clearly says that: 1. "GS: Yes [, plan to totally gut them] Right now the floors in there are wooden and wonky, and at different levels because of...
  6. P

    Toronto Toronto | Five St Joseph | 160.93m | 48s | Five St. Joseph | Hariri Pontarini

    Yes, "either raising or lowering the floors and converting the spaces into residential and retail" is what I remember as well. But I also reading that the buildings are in very bad shape, and not much of the original materials will be left. Also, I cant imagine how they can lower/raise the floor...
  7. P

    Toronto Toronto | Five St Joseph | 160.93m | 48s | Five St. Joseph | Hariri Pontarini

    There was a video of a developer explaining why they elected not to expand parking (this was their original plan, but they had to cut back to reduce costs). I've been trying to find the video, but couldn't find it. I am sure 42 would know...
  8. P

    Toronto Toronto | Five St Joseph | 160.93m | 48s | Five St. Joseph | Hariri Pontarini

    Actually... from what I remember reading from the developer's documents, the plan is to demolish and rebuild most part of those Yonge Street buildings (ie, only facades and some minor structural items will be left, remainder will be completely rebuild from scratch).
  9. P

    Toronto Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    I have similar times with you. I was replying to Grimace who was saying that airport times are overstated, and are usually within 30 to 45 min range...
  10. P

    Toronto Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    I took this route daily for 3 months... and I can attest from my personal experience... of taking it daily... But what do I know...
  11. P

    Toronto Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    agreed. Train is not about saving lots of $$$. It's about reliability and predictability. I've done Airport-Union route dozens of times. Without any traffic, it takes just under 25 minutes. Any kind of traffic, usually increases travel time significantly (to well over 1 hour). I believe Airlink...
  12. P

    Toronto | 1233 Queen East | ?m | 8s

    Could you remind us, why did they have to remove ceiling slats for TRs to run? thanks
  13. P

    Toronto Toronto | Spadina Subway Extension Emergency Exits | ?m | 1s | TTC | IBI Group

    Thank you I guess it wouldn't matter much anyway. They would probably finish all tunnels by the end of the year.
  14. P

    Toronto Toronto | Spadina Subway Extension Emergency Exits | ?m | 1s | TTC | IBI Group

    Moley finished its run. http://ttc.ca/Spadina/index.jsp Was there a reason why Moley and Holey cant do a part of the Northern Tunnels?
  15. P

    Toronto Toronto | Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    I wonder the same thing. If I were to buy such a high-priced condo, I would buy it in a more exclusive building (ex, Four Seasons, Shangri-La, Ritz, or one of the boutique smaller condos such as Florian). I would not want to live in a huge vertical student ghetto with a high chance of fire...
  16. P

    Toronto Toronto | TCHC Block 32 Development | ?m | 41s | TCHC | KPMB

    I hear ya. I feel the same way. So sick of people who work the system, live off the taxes we pay, and cheat the system. As a part of my job, I see a lot of less fortunate people. Most honest poor people don't really benefit from the system. Instead, their place is taken by cheats and lazy...
  17. P

    Toronto Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited

    Was passing by today... they made a lot of progress. The support columns have the concrete deck laid all the way until the Viscount Link station. Pretty impressive. Sorry, but couldn't take pictures.
  18. P

    Toronto Toronto | One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    if only U Condos used their size and space to their advantage... I will die of old age before U Condos get build... Happy to see One Bloor going up so fast

Back
Top