    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    June 1, 2011 - The crane goes in.
  2. jivey80

    Toronto Toronto | Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Nice shots. Looks like you're in P&G. I think people in the Nestle building would have the best view of that Emerald Park
  3. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    An update on the site: - staircase is done - sewer pipes are being installed More Hullmark photos
  4. jivey80

    Toronto Toronto | Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Not much has changed. There is a column standing on the north side of the site which looks kind of odd. https://picasaweb.google.com/jtigas/BazisEmeraldParkCondos?feat=directlink
  5. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    Here's a cool site that I found posted on another thread. It explains a lot of what they are doing right now. http://www.anchorshoring.com/content/view/34/39/ They're also the company that built the Yonge-Sheppard subway tunnels. Check out this photo from a while back. It explains the...
  6. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    Awesome thanks! That looks much better.
  7. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    May 26 2011 update: - a second interior wall, pretty close to the first one, maybe the start of a stairwell - some more columns were put up, they're building 4 at a time - the south wall got longer - they built a staircase, perhaps for the construction workers to use to get into and out of...
  8. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    I only see one crane base right now. I'm guessing 2, one for each building.
  9. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    Update on the south east corner of the pit: An interior wall goes up, the south wall gets longer and a the 12th pillar is poured. Update on the north side: There are a bunch of sewer pipes ready to be installed. https://picasaweb.google.com/jtigas/TridelHullmarkCentre?feat=directlink
  10. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    Some more pillar frames went up last week and it looks like they're getting ready to pour the south wall, though very little will probably end up happening this week as it looks like rain until Friday. The Cat below is still working though chipping away at the west concrete wall. Anyone know why?
  11. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    Hullmark begins to rise! https://picasaweb.google.com/jtigas/TridelHullmarkCentre?feat=directlink
  12. jivey80

    Toronto Toronto | Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Here's another look at Dempsey's corner.
  13. jivey80

    Toronto Toronto | Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    South side = Shell station West side = Church North side = parking lot which I believe is owned by Oxford Properties
  14. jivey80

    Toronto Toronto | Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    I can verify that they were working today. That boring machine was drilling holes all day. Does anyone know if they leave those long steel beams in the ground or take them out when they're done.
  15. jivey80

    Toronto Toronto | Emerald Park Condos | 128.92m | 40s | Bazis | Rosario Varacalli

    Here's pic on construction. It looks like they are putting those long beams into the ground now. Here's a link for the album I'll be starting: https://picasaweb.google.com/jtigas/BazisEmeraldParkCondos#
  16. jivey80

    Bravo Condos (22 Norton in NYCC, Baywood/Pemberton, 19s, P+S/IBI)

    It's a friend's condo. I'm there every now and then.
  17. jivey80

    Toronto Toronto | Hullmark Centre | 167.94m | 45s | Tridel | Kirkor Architects

    I think this is where the crane goes.
  18. jivey80

    Bravo Condos (22 Norton in NYCC, Baywood/Pemberton, 19s, P+S/IBI)

    They're digging This is the latest photo of the construction. Looks like they've started digging. Click on the picture below. | | V